BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Farmingdale, New Jersey. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Questions Due Date: Dec 17th 2021, 5:00 PM EST The principal features of the work to be performed under this Contract include mobilization, demolition, bypass pumping, concrete work, installation of self-contained motorized slide gates and actuators, removal and disposal of existing mud valves including furnishing and installation of blind flanges at each of their existing penetrations, electrical, instrumentation and controls, site restoration, confined space entry and demobilization. Substantial Completion within one hundred forty days (140) calendar days and final completion within one hundred and fifty (150) calendar days The principal features of the work to be performed under this Contract include mobilization, demolition, by-pass pumping, concrete work, installation of selfcontained motorized slide gates, removal and disposal of existing mud valves including furnishing and installing blind flanges at each of their piping connections, electrical, instrumentation and controls, site restoration, and demobilization. 1. Establishment of the Contractor's Physical plant including, but not limited to, project horizontal and vertical control and layout, temporary fencing and security, set-up and operation of by-pass pumping equipment, temporary facilities, services for maintaining health and safety, confined space entrance protocol, and site cleanliness. 2. Pipe plugging and/or blocking of the existing 24-inch diameter influent sewer line at the point where it enters the pump station's influent channels from MH-1 to allow for this manhole to act as the wet well for bypass pumping operations. 3. Furnishing, delivery, off-loading and installation of slide gates in place of existing slide gates SG-1 and SG-2. This also includes the demolition of mud valves MV1 and MV2 and furnishing and installing blind flanges at each of their piping connections. 4. Structural work including new concrete within existing influent flow channels. 5. Electrical work including new conduits and wiring for new slide gate motorized actuators, remote control panel, and for instrumentation and control.

Award

Water / Sewer

$178,400.00

Public - City

Renovation, Site Work

10

12

2

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
452
Active Projects
208
Bidding Soon
4,137
All Active Projects
1,903
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2022

February 7, 2022

img_map_placeholder

To Be Determined, Farmingdale, NJ

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.