BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 6, 2021 at 7:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Kingston, Ontario. Completed plans call for site work for a water / sewer project.

Public Works and Government Services Canada (PWGSC), Real Property Branch requires a qualified general contractor to rehabilitate the outer breakwater at the Portsmouth Olympic Harbour located at 53 Yonge Street, Kingston. The Contractor must perform and complete the in-water Work by March 15, 2022, and must complete the project in its entirety by April 29, 2022. The purpose of this project is to rehabilitate the outer breakwater at the Portsmouth Olympic Harbour located at 53 Yonge Street, Kingston. Work for this project includes: - Repairs to existing piles by installing bolted split steel collars; - Installation of new piles consisting of twin micopile pipe casings, seated on bedrock with thread bars socket drilled into bedrock; and - Installation of new steel sheet pile wavescreens, and associated steel framing. Associated work includes localized demolition of existing structure, localized reinforced concrete deck extensions at new pile locations, augering in fill and rock, grout filled pipe casings, and (underwater) welding. This project requires the use of divers. Documents can be obtained at: http://discovery.ariba.com/rfx/11772363

Post-Bid

Water / Sewer

$500,000.00

Public - Federal

Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
71
Bidding Soon
891
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2021

January 20, 2022

Project location map

53 Yonge St, Kingston, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.