BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2022 at 7:00 PM

Updated November 15, 2023

Site work, asbestos abatement and renovation of a mixed-use development in Oakland, California. Completed plans call for the renovation of a pre-engineered storage facility; for site work for a pre-engineered storage facility; and for asbestos abatement for a 7,000-square-foot pre-engineered storage facility.

Contract time - 30 Calendar days Bond Bid(10%), Performance(100%), Payment(100%) LBE 25% The Owner reserves the right to waive any informality in the bidding and to reject any or all bids. Perform thorough water test after roof installation. Use a stopper in all drains to isolate roof replacement from existing plumbing.Remove and dispose of existing 2ply BUR and gravel as trash. Prime concrete substrate with asphalt primer. Mop 3ply and glass cap at field. From roof to wall Mop 1ply and SBS cap sheet, add metal to top of parapet wall. Terminate membrane with concrete fasteners, 3 course with asphalt mastic/reinforcement and coat termination with elastomeric. Asbestos abatement removal, which is in the roofing material of parapet walls approximately 7,000 sq. ft. of repairs verify in field.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$181,963.00

Public - City

Asbestos Abatement, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
449
Active Projects
226
Bidding Soon
3,276
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2021

February 24, 2022

Project location map

900 High St, Oakland, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.