BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Ocala, Florida. Completed plans call for site work for a water / sewer project.

ITB11192100000156 Lift Station No.91 Force Main Upgrade A Pre-Bid Meeting and Site Visit are not scheduled for this project. This project consists of upgrading an 18" force main to 24" on SW 38th Street (County Road). This force main is coming from the Master Lift Station #91 that pumps to Water Reclamation Facility #3.Construction is within the right-of-way of SW 38 th Street from SW 48th Avenue to SW 60th Ave Installation of 12", 18" & 24" PVC Piping via directional bore or open cut, as specified on the plan set. 2. Installation of 12", 18" & 24" Ductile Iron Fittings. 3. Installation of 12", 18" & 24" Plug Valves. 4. Upgrading of air release valves. 5. Cut, cap, and abandonment of existing 18" force main. 6. Installation and maintenance on traffic control devices. 7. Removal and replacement of existing asphalt pavement as per Marion County standards, including road striping and markers. 8. Removal and replacement of existing sidewalk and curb & gutter. 9. Removal and replacement of existing landscape and sod. 10. Sewage tanker pumping for Lift Station #91 during nighttime tie-ins. A temporary manifold will be installed by the City on the lift station bypass valve that will allow the lift station to pump directly into the tankers. The tankers will empty in a manhole at Water Reclamation Facility #3 (3100 SW 67 th Ave, Ocala). Four lift stations will be redirected prior to tie-ins. The daily flow to Lift Station #91 the night of the tie-ins will be 1,238,255 gallons per day

Award

Water / Sewer

$3,032,916.00

Public - City

Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
65
Bidding Soon
1,210
All Active Projects
504
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2022

February 14, 2022

img_map_placeholder

To Be Determined, Ocala, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.