BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in San Jose, California. Working plans call for site work for a water / sewer project.

The objective of the Palo Alto Flood Basin Tide Gate Structure Replacement Project (Project) is to construct a replacement tide gate structure and remove the existing structure which has reached the end of its service life. The new structure will ensure continued flood protection provided by this critical infrastructure for Matadero, Adobe, and Barron Creeks, and the City of Mountain View Coast Casey Pump Station, and to protect the existing PAFB habitat and continued public recreational use of the levee trails. Notice is hereby given that the Santa Clara Valley Water District (Valley Water) has determined that all General Contractors wishing to bid on the Palo Alto Flood Basin Tide Gate Structure Replacement Project (Project) must be prequalified prior to submitting a bid on the Project. Bids will not be accepted from any contractor that has failed to comply with the requirements stated in this Prequalification Application. A current Class A California Contractor's License is required to bid on the Project. +1 253 215 8782 US (Tacoma) +1 646 558 8656 US (New York) +1 301 715 8592 US (Germantown) +1 312 626 6799 US (Chicago) Meeting ID: 379 605 4075 Find your local number: https://valleywater.zoom.us/u/aekffBkBma Online Q&A Yes Q&A Deadline Tuesday, January 18, 2022 5:00 PM (PST) Estimated Project Cost: $20 million to $27million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Basin holds the stormwater and the tide gate structure which provides the outlet for stormwater into the Bay during low tides. The tide gate structure controls the water elevation in the basin by keeping high tide out and allowing the water to empty out twice daily during low tides. One of the gates is a sluice gate that is being operated by the City of Palo Alto and incorporated on their SCADA system which allow some tidal inflow to improve the Basin's water quality habitat. Project has been cancelled.

Final Planning

Water / Sewer

$27,000,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
287
Active Projects
131
Bidding Soon
2,621
All Active Projects
1,092
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 27, 2022

October 31, 2022

img_map_placeholder

Multiple Locations, San Jose, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.