BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Moses Lake, Washington. Working plans call for site work for a water / sewer project.

**As of February 15, 2022 this project has been cancelled the city council motioned to reject all bids. A timeline for a re-bid has not yet been established.** Contract Working Days: 40 (8 weeks) This project consists of sand blasting and painting the City of Moses Lake Reservoir #2 located at 800 South Clover Drive. A magnetically attached telemetry antenna will be temporarily relocated and will need to remain in service throughout the project. A new 30-foot diameter latex printed City Logo will also be installed, and a small plaque near the base of the reservoir will be repaired and reattached. A rigid containment structure for sandblasting material and paint over spray will be required. The reservoir is approximately 96 ft tall and has a diameter of approximately 43 ft. Only bids from bidders who are currently on the MRSC Small Works Roster and Plan Holder List with the City of Moses Lake will be accepted. All bids shall be received before said opening time in sealed envelopes with RESERVOIR 2 PAINTING PROJECT marked plainly thereon. All bids shall be accompanied by a deposit in the form of a postal money order, cashier's check, or bond in an amount equal to 5 percent of the maximum total of the bid. All bidders shall be on the MRSC Small Works Roster prior to bid opening. Only bids from bidders who have received plans and specifications VIA the Civic Center Annex will be accepted. Copies of plans and specifications are on file for review at the cityofml.com Engineering projects website. Contract Working Days: 40 (8 weeks)

Final Planning

Water / Sewer

$241,721.00

Public - City

Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
12
Bidding Soon
139
All Active Projects
58
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2022

August 15, 2022

img_map_placeholder

800 S Clover Dr, Moses Lake, WA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.