BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, new construction and renovation of a mixed-use development in Horseheads, New York. Working plans call for the construction of a stadium; educational facility; for the renovation of a educational facility; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and playground / park / athletic field.

Voters overwhelmingly approved the first project of the plan in October 2017. That project has resulted in major improvements at the High School and Middle/Intermediate complex, with some improvements at the elementary schools. This second of three projects would continue the build, focusing on our elementary schools, adding classrooms, renovating cafeterias and gyms, and improving the environment for our elementary students. There would also be additional work at the High School, including the addition of locker rooms, physical therapy spaces, and music storage at the new stadium, and gym/locker room improvements, roofing, and parking lot redesign at the Middle/Intermediate schools. This project would also enable the district to regulate the temperatures in our classrooms/buildings through the continued installation/upgrade of heating/ventilating and cooling systems. Nearly all stores, businesses, and government buildings provide temperature controlled spaces, with heat or air conditioning as the weather determines. We believe our schools should too, so that our students can be in an environment that is conducive to learning. The upgraded mechanical systems of this project would address both heating and cooling in our schools. Big Flats Elementary School • Classroom addition; Gymnasium/auditorium stage addition/renovations; Cafeteria/kitchen relocation and renovation; Library relocation and renovation; HVAC upgrades and replacements; Playground improvements; Parking lot and sidewalk improvements Gardner Road Elementary School • Classroom addition; Gymnasium renovations; Cafeteria/kitchen renovations; Library renovations; HVAC upgrades and replacements; Playground improvements; Parking lot and sidewalk improvements Ridge Road Elementary School • Classroom addition; Gymnasium/auditorium stage addition/renovations; Cafeteria/kitchen relocation and renovation; Library relocation and renovation; HVAC upgrades and replacements; Playground improvements; Parking lot and sidewalk improvements Middle School/Intermediate School • Gymnasium and locker rooms renovations; HVAC upgrades and replacements; Roof replacements; North parking lot circulation improvements and asphalt replacement; Playground improvements; Parking lot and sidewalk improvements High School • Multi-purpose physical education and athletics facility with gym, indoor track, training/exercise spaces, and weight room; Classroom renovations; East parking lot and bus drop off/pick up renovations; Roof replacements; Site improvements including concrete walks and improved pedestrian circulation; HVAC upgrades and replacements; Traffic flow/parking lot improvements Stadium • Visitor and home locker room additions; Physical therapy/trainer space; Music and multi-purpose storage; Officials locker room The district expects bids to be awarded as early as the spring of 2023 with phased construction beginning in the summer of 2023.

Pre-Construction/Negotiated

Educational

$122,254,993.00

Public - City

New Construction, Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
95
Bidding Soon
1,366
All Active Projects
577
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 1, 2023

August 24, 2027

img_map_placeholder

Multiple Locations, Horseheads, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.