BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Carrboro, North Carolina. Completed plans call for the renovation of a water / sewer project.

SRF Number WIF 1980 Bids will be received for a Single Prime Lump Sum General Construction Contract. The Contractor and all Subcontractors shall have valid North Carolina General Contractor's Licenses for the type and value of the work to be performed. -The Project consists of furnishing all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete and operable installation of: Belt Filter Press No.1 replacement, conveyance system replacement and improvements, belt filter press controls upgrade and HVAC and Roof replacement for existing Belt Filer Press Building, and all associated appurtenances as shown on the Drawings and described in the Specifications. The foregoing description shall not be construed as a complete description of all work required. Orange Water and Sewer Authority has adopted a minimum ten (10%) percent goal for participation by minority businesses in the total value of the work for this project in accordance with Section 143-128.2 of the General Statutes of North Carolina. Orange Water and Sewer Authority has adopted a minimum ten (10%) percent goal for participation by minority businesses in the total value of the work for this project in accordance with Section 143-128.2 of the General Statutes of North Carolina. Each Bidder shall be licensed under Chapter 87 of the North Carolina General Statutes. Bidders are notified that "An Act to Regulate the Practice of General Contracting," was ratified by the General Assembly of North Carolina on March 10, 1925, and that this Act and subsequent Amendments, will be observed in receiving and awarding Contracts. Each bidder is required to submit a Non-Collusion Affidavit pursuant to Section 133-30 of the General Statutes of North Carolina. To ensure that all Bidders are kept up to date on any Addenda, changes, or information notices, please send an e-mail to: owasabfp@hazenandsawyer.com, indicating your intention to prepare a Bid for the Project. Failure to complete this step may render your Bid as non-responsive. Each Bidder is advised that the Work may be inspected and supervised by an Engineer or firm under the direction of Orange Water and Sewer Authority. The Engineer or firm may also be involved in the identification of specific repair areas and the proposed method of repairs for the Work. Orange Water and Sewer Authority requires the Project to be at Substantial Completion within 540 consecutive calendar days from date of Notice to Proceed and at Final Completion 570 consecutive calendar days from date of Notice to Proceed. No Bid shall be considered or accepted unless at the time of its filing the same shall be accompanied by a deposit of a certified or cashier's check drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation (FDIC), in an amount equal to five percent (5%) of the amount of the Bid. The check shall be made payable to Orange Water and Sewer Authority. Said deposit shall guarantee that the Contract will be entered into by the successful Bidder if the Award is made. Such deposit of certified or cashier's check may be held by Orange Water and Sewer Authority until the successful Bidder has executed and delivered the Contract Documents, including performance and payment bond, to Orange Water and Sewer Authority and returned or kept in accordance with North Carolina General Statute 143-129. In lieu of the certified or cashier's check deposit mentioned above, the Bidder may file a Bid Bond in the same amount executed by a corporate surety authorized to execute such bonds in North Carolina and conditioned as provided by North Carolina General Statute 143-129 and on the form(s) found in the Proposal section, or on file with the Engineer. Bid Bond forms enclosed as part of the Bidding Documents must be properly executed at the time Bids are submitted before a Bid will be considered. Properly executed Power of Attorney of the corporate surety's agent shall accompany such bond and be attached to the page provided therefore in the Bidding Documents Bids shall be submitted under a condition of irrevocability, except as required by law, for a period of or ninety (90) calendar days after the Bid opening. Orange Water and Sewer Authority reserves the right to accept or reject any or all Bids, to waive any and all informalities, and to disregard all nonconforming or conditional Bids or counter Bids, and to accept the Bid that will be in the best interest of Orange Water and Sewer Authority.

Bid Results

Water / Sewer

$3,451,500.00

Public - County

Renovation

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
120
Bidding Soon
1,747
All Active Projects
756
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 12, 2022

March 14, 2022

October 5, 2023

img_map_placeholder

400 Jones Ferry Rd, Carrboro, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.