Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 6, 2023 at 7:00 PM

Updated June 7, 2025

Site work, paving and outdoor lighting for a mixed-use development in Cocoa Beach, Florida. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of November 6, 2023, an engineer has been selected. Further details regarding design and construction have not been identified. A firm timeline for construction has not been establisihed; however, the project is not funded for construction at this time, no indication of when it might be funded, if at all. A detailed scope has not yet been released. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Letter of Response and Interview District : 05 S.R. A1A Brevard Sidewalk Gaps TRC Members (Subject to Change) : Alexandra Holtkamp Megan Owens Shelley ChinQuee S.R. A1A Brevard Sidewalk Gaps - Construction of sidewalk to fill gaps along S.R. A1A from Grosse Pointe Avenue to Flug Avenue, Volunteer Way to Roosevelt Avenue, and Shearwater Parkway to S.R. 404. Install wireless interconnect between SR 518 and SR 404. Shortlist Selection Date/Time 1/10/2022 Technical Review Committee Meeting 1 Date/Time 1/25/2022 Technical Review Committee Meeting 2 Date/Time 1/25/2022 Technical Review Committee Meeting 3 Date/Time 1/26/2022 Consultant Interviews Date/Time 1/26/2022 Final Selection Date/Time 2/07/2022 Negotiations Period Begin Date 2/12/2022 Negotiations Period Ending Date 4/07/2022 The method of contractor selection has not been determined at this time. FDOT - RFP - Street Road A1A Brevard Sidewalk Gaps

Design

Roads / Highways

$2,367,705.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
114
Bidding Soon
1,559
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 31, 2024

Project location map

Florida A1A, Cocoa Beach, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed