BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Colorado Springs, Colorado. Completed plans call for the renovation of a educational facility.

Columbine Hall was constructed in 1997 and is the most heavily used academic building on campus. The building includes two built up penthouse air handlers, with AHU-1 serving the classroom wing and AHU-2 serving the office wing. Each unit consists of a supply fan, return fans, hydronic heating coil, built up DX cooling coil with evaporative condensing unit and controls. Return Air System Replacement: The return fans for AHU-2 were installed in a relief fan configuration that requires the building to be pressurized to return air to the penthouse unit. The ceiling plenums in both wings were compartmentalized into return air (RA) zones. Transfer ducts were installed to move RA from each zone back to the main RA shaft that allowed RA to move up to the penthouse unit. During the original construction, some RA zones were not provided before reaching the RA shaft and most transfer ducts were sized too small. AHU Refurbishment: The CM project consists of replacing the R22 DX cooling coils, evaporative condensing unit, R22 compressors and associated piping and components from the penthouse air handing unit with a R438A DX cooling system. The project requires engineering services to evaluate and design modifications to the RA system and refurbishment of the AHU. Reactive maintenance is being practiced in order to bridge the gap before replacement can occur. UCCS, will provide Preliminary Design Documents and design intent. These documents are not to used as Construction Documents, it is the D/B Teams responsibility to provide all required Contract Documents per the Agreement and General Conditions. Email Questions Due, September 22, 2022 by 4 pm Email questions to Catherine Robbins at submit@uccs.edu Answers will be posted here by September 30, 2022 Contract Approval (projected): November 18, 2022 Anticipated General Contractor Start: December 15, 2022 Anticipated Construction Finish: December 15, 2023

Award

Educational

$479,020.00

Public - State/Provincial

Renovation

31

9

25

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
59
Bidding Soon
752
All Active Projects
327
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2022

November 21, 2022

img_map_placeholder

1420 Austin Bluffs Pkwy, Colorado Springs, CO

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.