BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Normal, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Proposed Intersection Improvements at Ft Jesse Road and Landmark Drive and Ft Jesse Road and Greenbriar Drive General Project Description: This project consists of the installation of new traffic signals and roadway widening at two intersections. The work includes approximately 214 CY of Removal of Unsuitable Material, 470 Ton of Subbase Granular Material, Ty. B, 372 SY of 8” PCC Pavement, 760 FT of Combination Concrete Curb & Gutter Removal and Replacement, 675 TON of Hot-Mix Asphalt, traffic signal equipment, and all other necessary items and incidentals required to complete this project according to the plans and specifications. Unless otherwise stated in the Invitation to Bid, each bidder must submit a Security Deposit with its Bid. The amount of the Security Deposit must be no less than 5% of the Bid amount The Security Deposit must be in the form of a bid bond, cashier’s check, or certified check. This is a prevailing-wage project. Prevailing-Wage Requirements; Davis-Bacon Act. The Prevailing Wage Act requires awarded vendors and subcontractors to pay laborers, workers, and mechanics performing services on public works projects no less than the “prevailing rate of wages” in the county where the work is performed. When required, awarded vendors are responsible for paying current prevailing wage rates, as posted on the Illinois Department of Labor’s website at www.state.il.us/agency/idol SCHEDULE Contractor shall begin work within ten (10) days after receipt of Notice to Proceed. Five (5) days notice shall be given by the Contractor prior to beginning work requiring closing of the street. Typical membrane curing as allowed by the Standard Specifications will not be permitted for concrete poured after September 15. A combination curing compound and salt blocker will be required after September 15. Chem Masters Silencure SRT or a Town approved equal shall be used after September 15. All work shall be completed on or before October 31, 2024. Article 108.09 shall apply if work is not completed by this date. The Town reserves the right to reject any or all bids received. The bid award will be made by the Town Council, and the decision of the Council will be final

Award

Roads / Highways

$2,150,445.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
60
Bidding Soon
990
All Active Projects
435
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 7, 2024

May 7, 2024

October 31, 2024

img_map_placeholder

Ford Jesse Rd. & Landmark Dr., Normal, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.