Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving, renovation and addition to a mixed-use development in Dover, Massachusetts. Completed plans call for the addition of a clubhouse / community center; for the demolition of a clubhouse / community center; for the renovation of a clubhouse / community center; for site work for a clubhouse / community center; water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Agency Name and Address Dover, Town of 5 Springdale Avenue Dover, MA 02030 Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. General Contractor and Filed Subcontractor Request for Qualifications for the Dover Community Center project at 4 Springdale Avenue, Dover, MA. The project consists of 20,000SF of addition renovation of a Community Center Building and the associated sitework utilities, parking, vehicular paths, landscaping, etc. Additional Information Please contact John Bates, Owners Project Manager, with any questions. The Project consists of the demolition of the 1971 and 1931 additions to the original 1910, 2story Caryl School, complete gut renovation of the 1910 building, partial regrading of the site, installation of new MEP systems, septic system, installation of a water storage tank integral pump house to supply the Fire Suppression system, as well as the construction of a new addition housing a large Recreational Court and a Community Room, as well as 2story vertical circulation section attached to the back of the 1910 building. This is an addition renovation project totaling approximately 20,000sf. The addition foundation is poured in place concrete footings and foundation walls with structural steel predominantly the structure of the addition, with the exception being loadbearing CMU walls at the Recreational Court. The original 1910 building is a stone foundation with some new poured in place concrete underpinning required at areas, existing wood floor framing with new structural steel required at some areas along with new LVL beams throughout the 2 nd floor framing floor joists and new plywood subfloor throughout at the 2 nd floor and attic level. The partitions are metal stud and wood stud with drywall throughout the renovation and addition, with the exception of the CMU walls at the Recreational Court. The exterior envelope predominantly consists of brick veneer cladding at the exterior walls a percentage of the brick veneer at the 1910 building is to be repointed), new aluminum and fiberglass windows and storefront, TPO roofing membrane at the flat roofs, architectural asphalt shingle at the Pavilion structure at the 1910 building.
Post-Bid
Sidewalks / Parking Lot
$17,500,000.00
Public - City
Addition, Demolition, Paving, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 1, 2023
June 5, 2023
4 Springdale Ave, Dover, MA
Related To This Project
Dover, MA
Bid Date: Feb 22 2023
Dover, MA
Bid Date: Mar 29 2023
Dover, MA
Bid Date: Apr 19 2023
Dover, MA
Bid Date: Apr 12 2023
Dover, MA
Bid Date: Apr 26 2023
Dover, MA
Bid Date: May 31 2023
Dover, MA
Bid Date: May 25 2023
Dover, MA
Bid Date: May 24 2023
Dover, MA
Bid Date: Jun 15 2022
Dover, MA
Bid Date: May 11 2022
Dover, MA
Bid Date: Jun 08 2022
Dover, MA
Bid Date: May 16 2022
Dover, MA
Bid Date: Apr 26 2022
Dover, MA
Bid Date: Feb 01 2023
Dover, MA
Bid Date: Oct 05 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.