BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in West Columbia, Texas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the construction of a water / sewer project; and water / sewer project.

Report No. 124728 This Project will consist of all work associated to construct Water Plant No. 2 facilities including a 0.3 MG ground storage tank, 500 gpm booster pump station, electrical/chemical building, stand-by generator, new electrical equipment, moving existing chemical equipment, site paving and connecting proposed infrastructure to existing water lines. The deadline to ask questions is 1/20/2022 12:00 PM CST Estimate: $2.8 - $3 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A. Construct Work as described in the Contract Documents. 1. Provide the materials, equipment, and incidentals required to make the Project completely and fully operable. 2. Provide the labor, equipment, tools, and consumable supplies required for a complete Project. 3. Provide the civil, architectural, structural, mechanical, electrical, instrumentation, and all other Work required for a complete and operable Project. 4. Test and place the completed Project in operation. 5. Provide the special tools, spare parts, lubricants, supplies, or other materials as indicated in the Contract Documents for the operation and maintenance of the Project. 6. The Contract Documents do not indicate or describe all Work required to complete the Project. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the Construction Manager. B. Owner may pre-select or pre-purchase goods for this Project per Section 01 64 00 "OwnerFurnished Goods and Special Services." Install these goods and coordinate the performance of specified special services. All work associated with construction of Package 1 of the West Columbia Water Plant No. 2 rehabilitation including a 0.3 MG Elevated Storage Tank, 500 gpm pump station, treatment facility relocation, electrical and chemical building, natural gas stand-by generator, and utilities/appurtenances necessary for the function of the plant.

Award

Water / Sewer

$3,494,000.00

Public - City

New Construction, Paving, Site Work

Subscribe For Documents

118 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
48
Bidding Soon
2,449
All Active Projects
951
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2022

March 28, 2022

img_map_placeholder

To Be Determined, West Columbia, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.