BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 28, 2021 at 7:00 PM

Updated November 15, 2023

Renovation of a mixed-use development in Ripley, Oklahoma. Completed plans call for the renovation of a educational facility.

POTENTIAL BIDDERS A. Sealed Bids addressed to Owner will be received at Place of Bid until Time of Bid on Bid Date. B. General Contractors are required to prequalify to the approval of the Architect, no later than ten (10) days prior to submission of bids if they have not previously bid on a project for Architect or Owner within the previous twelve (12) months from bid date. Utilize AIA Form A305 - Contractor's Qualifi cation Statement. C. Bidders may view electronic fi les of the Bid Documents via Dropbox using website. Electronic fi les will be uploaded and available for viewing from 8 December 2021 to 6 January 2022. 1. Paper copies are viewable at the Offi ce of the Owner or Architect. Submit your offer on the Bid Form provided by BWA Architects Tulsa offi ce once approved to bid. F. Your Bid is required to be submitted under a condition of irrevocability for a period of 30 days after submission. G. The Owner reserves the right to accept or reject any or all offers.

Post-Bid

Educational

$140,000.00

Public - City

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Substitution Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Control, Contractor Quality Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Entrances and Storefronts, Glazing, Glass Glazing
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
87
Bidding Soon
979
All Active Projects
402
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2022

February 7, 2022

img_map_placeholder

403 1st Ave, Ripley, OK


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.