BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Barstow, California. Completed plans call for site work for a warehouse / distribution facility.

The work is expected to start on or about February 2022; Final Completion of the entire Work within ONE HUNDRED SIXTY (160) Working Days. In general, construction of the various collection systems shall include installation of 4-and 6-inch diameter HDPE piping (slotted and solid), installation of 8-ounce and 12-ounce non-woven geotextile fabric, placement of LCRS or collector gravel, placement of LFG Evacuation System piping and other incidentals and appurtenances as required to complete the work in accordance with the Plans, these Technical Specifications, and material manufacturer's recommendations. Contractor shall provide, install and complete as specified and pay for all labor, materials and equipment, tools, supplies, construction equipment and machinery, construction, start-up and testing, utilities, transportation, and other facilities and services (including any temporary materials, equipment, supplies and facilities) necessary for the proper execution and completion of the complete, operational, and fully functional Project, including the permanent interconnection for electricity, natural gas, water supply, and any other utilities and demonstration of fully satisfactory operation of all systems and equipment. The County will pay connection fees directly to the utilities for all permanent water and electrical connections. Clear, Grub, Demolition, Removals Unclassified Excavation/Transport to South Stockpile Unclassified Excavation/Transport to North Stockpile/Provide Daily Cover Soil for Contract Operator Unclassified Excavation to Fill Compacted/Screened 1" Minus Material Floor Geosynthetic Clay Liner (GCL) Floor 60-mil Geomembrane (Textured Both Sides) Encapsulation Geomembrane 60-mil Geomembrane (Textured Both Sides) Geomembrane Floor Geotextile 12-ounce (Floor) LCRS Gravel (Floor) Geotextile 8-ounce (Floor) Geosynthetic Clay Liner, GCL (Slopes and Roadway/Benches) 60 Mil Encapsulation Geomembrane (Textured Both Sides) (Slopes and Roadway/Benches) 60 Mil Geomembrane (Textured Both Sides) (Slopes and Roadway/Benches) 16 oz Geotextile (Slopes and Roadway/Benches) Plastic Liner Cover (Scrim) (Details 3/D4, 4/D4, 5/D4, and 6/D3)

Award

Warehouse / Distribution

$5,934,352.00

Public - County

Site Work

85

16

8

4

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
70
Bidding Soon
1,274
All Active Projects
510
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2022

May 16, 2022

img_map_placeholder

32553 Barstow Rd, Barstow, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.