BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 25, 2022 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Barstow, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of August 25th, 2022, project has not been awarded. Project is expected to be awarded sometime after September 7th. This construction project is located on North 1st Avenue in the City of Barstow. The City of Barstow (City), in cooperation with the California Department of Transportation (Caltrans) and the San Bernardino County Transportation Authority (SBCTA), is proposing to replace the existing two-lane North 1st Avenue bridge over the BNSF railyard with a new two-lane bridge including 8-foot shoulders and an 8-foot sidewalk. The southern terminus of the project would be just south of White Street and the northern terminus would be at Riverside Drive. The existing bridge would be demolished and removed. The North 1st Avenue Bridge Replacement Project (Project) consists of, but is not limited to, the following components: Construction of new 7-span post-tensioned concrete box girder bridge on seat type abutments and deep foundations. Removal of existing 29-span steel truss and steel / timber girder bridge across the BNSF railyard. Removal of existing building foundations. Construction of new 380-foot-long soil nail retaining wall. Realignment of North 1st Avenue approach roadway and intersections. Associated work includes utility relocation, drainage improvements, lighting improvements, pavement construction, curb ramps, sidewalks, and improvements to Del Taco parking lot. Liquidated Damages 13,500 Per Calendar Day of Delay Online Q&A Yes Q&A Deadline 06/10/2022 4:00 PM (PDT) "Base Bid" estimate for this project is approximately Forty Three Million, Three Hundred and Seven Thousand dollars ($43,680,000). Notice To Proceed: September 2022

Bid Results

Bridges / Tunnels

$30,725,220.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

108 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
324
Active Projects
152
Bidding Soon
2,186
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2022

January 9, 2023

Project location map

N 1st Ave, Barstow, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.