BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Hinckley, Minnesota. Completed plans call for site work for a clubhouse / community center.

The Mille Lacs Band of Ojibwe, Community Development office will be accepting sealed bids for preparation of area, purchase and installation of a playground to be located at the Mille Lacs Band of Ojibwe District III Lake Lena Community Center. General Notes: Project is a Federal Davis-Bacon Commercial Project. As such certified payroll will be collected and all workers must be paid at or above the Commercial Davis Bacon Wage rate in force at the time of this RFP issue date. It is the Contractors responsibility to identify any and all discrepancies in the scope of work, not meeting Industry Standards or that which is inconsistent with the International Residential Code (IRC), and Mille Lacs Band of Ojibwe 2016 MLB Project Specification Book. All electrical wiring, apparatus and equipment for electric light, heat and power, technology circuits or systems shall comply with the rules of the Department of Commerce or the Department of Labor and Industry, as applicable, and be installed in conformity with accepted standards of construction for safety to life and property. Contractor must reconnect all utilities, service panel or service feed. Also includes gas, propane. Include such equipment or materials identified in the pre-bid conference. Contractor will secure all permits and fees. Contractor is responsible for a thorough investigation of the scope of work. Contractor will repair any damage to the property or structure created by the scope of work. Contractor shall be responsible for all debris removal related to all work performed under this work scope. NO WORK SHALL BE PERFORMED UNTIL ALL REQUIRED PERMITS HAVE BEEN ISSUED AND COPIES IN THE POSSESSION OF THE PROJECT COORDINATOR AND /OR MILLE LACS BAND BUILDING OFFICIAL. COMMUNITY DEVELOPMENT WILL, TO THE GREATEST EXTENT FEASIBLE, GIVE PREFERENCE IN THE AWARD OF CONTRACT TO INDIAN ORGANIZATIONS AND INDIAN-OWNED ECONOMIC ENTERPRISES. Work Scope Description: Playground equipment needed for age group(s) 5 to 12 years. Budget amount for all-inclusive package including all items is $135,000.00. Owner will select preferred equipment package from venders to determine contract award. Please submit 2-3 designs for review. Final color selections will be made by the Owner. Provide color package templates. Once selected, contractor shall produce selected color drawings for final approval. Provide product data for all equipment being proposed and cost breakdown for all items. Approximate area of playground base is 2400ft2. Install 4" drain tile, border, rock, geotextile filter fabric. Include ADA access point into the border. Remove sod/topsoil to a depth of 10 inches within perimeter to prepare site for playground equipment installation. Level area. Dipose of excess material off-site. Supply and install 4" perforated corrugated drain tile w/ sock ran to day light with rodent guard installed. Supply and install pea rock to a depth of 4" following installation of playground equipment Install geotextile filter fabric as per manufacturer's recommendation over rock bed. Supply and install 6"x6" plastic lumber boarder to 7" above grade, 4" below grade. Double layers with staggered seams fastened every four feet using 12" common spike nails, include a ADA access wedge. Install poured rubber fall protection material to a depth of 9" above geotextile filter fabric. Areas of top soil disturbed by the completion of items in this RFP are to be leveled and or infilled with black dirt and grass seed and starter fertilizer applied. All Contractors and Suppliers must be licensed with the Mille Lacs Band of Ojibwe. Please contact Elizabeth Thornbloom at 320-532-8274 or via email ethornbloom@grcasinos.com for more information. Davis Bacon Commercial Construction wage rates apply. All proposals must be on attached FY 2022 Bid Form. Contacts: Interested bidders shall contact Mike Moilanen at mike.moilanen@millelacsband.com to be included on the bidder's list in the event that any addendums are issued for this project. Mobilization: The Contractor shall be capable of mobilizing his equipment and crews within 6 weeks of the receipt of Notice to Proceed. Contractor shall submit building schedule to Project Coordinator at the time of contract signature by the Contractor. Contractor shall provide means and methods for all building phases of construction. Community Development/project Management Reserves the Right to Reject Any and All Bids for Any Reason. Licensing: Firms must be licensed with the Mille Lacs Band of Ojibwe. A copy of this license (or the license application) must accompany each bid. Licensing process can take several weeks. If you are not currently licensed with the MLBO, please submit a copy of your license application along with your proposal. Contact Elizabeth Thornbloom at (320)532-8274 or via email at ethornbloom@grcasinos.com with questions regarding licensing and for the license application. Permit and Contractor Requirements: Permits: Contractors are responsible to attain all necessary permits for all work, including Mille Lacs Band of Ojibwe (MLBO) Permits. Mille Lacs Band Permit Fee is $50.00. Bonding Requirements: In accordance with 2016 MLB Project Specification Book. A. In construction contracts that are federally funded or deemed commercial, bonding is required. These types of contracts shall demand a performance bond not less than twenty (20%) percent of the total contract price, but not to exceed $500,000.00. A performance bond requirement is to ensure that, if a contractor defaults, the Band may request that the surety pay the expense incurred to complete the construction contract. B. In addition, all construction contracts identified as federally funded or commercial shall be covered by a payment bond equal to one payment installment or cover subcontractors/suppliers as determined by the Contracting Officer or his agents. The payment bond must contain language stating that if the contractor fails to make a payment to its subcontractors/suppliers, the surety will make the necessary payment.

Post-Bid

Playgrounds / Parks / Athletic Fields

$600,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
38
Bidding Soon
493
All Active Projects
183
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2022

March 10, 2022

img_map_placeholder

45749 Grace Lake Rd, Hinckley, MN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.