BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Milledgeville, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Reconstruction of 4th Street from Cochran Avenue to Main Avenue; Cochran Avenue from 4th Street to 150 north; Depot Street from 4th Street to the railroad right-of-way; and 250 feet of alleys. The construction includes new pavement, concrete gutter, concrete sidewalk, watermain, water services, and grading and shaping ditches. CONTRACTOR shall be substantially completed within 120 consecutive calendar days. Substantially complete shall be defined as the completion of all construction work and well testing. CONTRACTOR shall be at final completion within 180 days. Project Location - 4th Street from Cochran Avenue to Main Avenue; Cochran Avenue from 4th Street to 150 north; Depot Street from 4th Street to the railroad right-of-way; and 250 feet of alleys west of Main Avenue The CONTRACTOR shall furnish all labor, equipment, and materials necessary to construct the 4th Street reconstruction and drainage improvements as described on the construction drawings. In general, the major components of the proposed Work under this Contract will include, but not be limited to, the following items at the relevant sites 1. New pavement. 2. New concrete curb. 3. New concrete sidewalk. 4. Grading and shaping ditches. 5. Watermain and water service construction. 6. Fire hydrants and mainline valves

Bid Results

Roads / Highways

$709,800.00

Public - City

Paving, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
43
Bidding Soon
649
All Active Projects
287
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2022

March 28, 2022

img_map_placeholder

E 4th St, Milledgeville, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.