Published December 10, 2021 at 7:00 PM

Updated October 1, 2024

Site work for a power facility in Lewiston, New York. Completed plans call for site work for a power facility.

The New York Power Authority (Hereinafter "the Authority" OR "NYPA") is seeking proposals to furnish, deliver, and install a replacement for the existing tie bus and new isolation disconnect switches between each of the thirteen (13) 480V unit substations and the tie bus which links them together, at the Authority's Robert Moses Niagara Power Project (RMNPP). A pre-bid meeting will be held prior to bid submittal. Firms/entities are hereby directed to make use of the New York Power Authority's website at www.nypa.gov in order to obtain instructions on participating in submitting company information through Ariba. Commensurate experience is required for this project. Further details on qualifications/requirements can be found in the Scope of Work. Minority Owned Sub-Contracting Goal: 5% Women Owned Sub-Contracting Goal: 10% The objective of this project is to replace the existing tie bus and to install new isolation disconnect switches between each of the thirteen (13) 480V unit substations and the tie bus which links them together, at the New York Power Authority's (herein after referred to as "the Authority") Robert Moses Niagara Power Project (RMNPP

Post-Bid

Power Plant

$500,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Refrigerant Piping, Refrigerants
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Power Filters and Conditioners, Capacitors
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
351
Active Projects
206
Bidding Soon
2,930
All Active Projects
1,365
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2022

February 14, 2022

img_map_placeholder

5777 Lewiston Rd, Lewiston, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Niagara Robert Moses Substation Tie Bus Isolation Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.