BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in New York, New York. Completed plans call for the renovation of a municipal facility.

Install New Rubber Stair Treads A New York State Department of Labor Prevailing Wage Request is submitted on behalf of OPWDD as the contracting agency. This project will be assigned an Original Wage Schedule with an assigned Prevailing Rate Case number (PRC#). Selected vendor must comply with all prevailing wage regulations distributed by the NYSDOL Bureau of Public Work. Under New York State Labor Law, contractors and subcontractors must pay the prevailing rate of wage and supplements (fringe benefits) to all workers under a public work contract. Employers must pay the prevailing wage rate set for the locality where the work is performed. Prevailing wage is the pay rate set by law for work on public work projects. This applies to all laborers, workers or mechanics employed under a public work contract. OPWDD reserves the right to reject any quote and all quotes. Minority Owned Sub-Contracting Goal: 30% Women Owned Sub-Contracting Goal: 7% The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 14 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent. SCOPE OF WORK includes, but is not necessarily limited to the following 1 remove old rubber stair tread on steps and discard them 2 clean and prep steps 4 install tread steps using a rubber stair tread adhesive and synthetic grey rubber Stair tread 4 provide a 10 year guarantee on labor and material Service-Disabled Veteran-Owned Business Contracting Goal: 6% Location: 1150 Forest Hill Road Bldg 47C Staten Island NY 10314

Post-Bid

Municipal

$50,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
510
Active Projects
304
Bidding Soon
4,522
All Active Projects
2,027
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2022

February 4, 2022

img_map_placeholder

1150 Forest Hill Rd, New York, NY

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.