Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Commerce City, Colorado. Contact the soliciting agency for additional information.
Project: Reunion Underdrain Maintenance Phase 1 The project consists of videoing of approximately 6,180 LF of existing underdrain mainline and approximately 18 cleanouts to determine necessary maintenance to the system for the Reunion Metropolitan District. The project is generally located in Commerce City, CO along E. 108th Ave., Fairway Dr., Nucla Ct., Nucla St. and Parkside Drive South. Maintenance improvements include pumping water out of the underdrain, CCTV video of the existing mainline and cleanouts, cleaning the line by flushing, jetting, vacuuming, or other means necessary, locating & removing cleanout access lids, traffic control, and permitting associated with the work. Some cleanouts are in manhole accesses with sweep connections to the mainline while older cleanouts are in smaller square accesses with tee connections to the mainline. Work shall include replacing existing unserviceable square cleanout lids with comparable watertight lids and securing them in place. It is assumed that a certain amount will be in serviceable condition and are to remain. Pipe sizes consist of approximately 909 LF of six inch (6), 1,507 LF of eight inch (8), and 4,214 LF of ten inch (10). Cleanout depths range from 12-ft to 28-ft deep. Pricing for alternates is also requested. Alternate 1 includes replacing existing rectangular cleanout accesses with manhole cleanout accesses per the District Underdrain System Rules and Regulations. Bid Alternate 2 includes constructing a full depth underdrain manhole per the District Underdrain System Rules and Regulations. Sole responsibility rests with the submitter to see that their proposal is received on time. The purpose of the bids is to establish a contract for work to be completed by December 1, 2022. Reunion Metropolitan District presently anticipates issuing the Notice of Award on or about February 7, 2022. A bidder to whom a contract is awarded will be required to furnish a certificate of specified insurance coverages as specified in Exhibit C of the Independent Contractor Agreement. No bid may be withdrawn for a period of forty-five (45) days after the date the bids are opened. Owners Rights Reserved - The Owner reserves the right to accept or reject any and all Bids, to waive any informality or technicality in any Bid, to postpone the award of the Contract for a period not exceeding forty-five (45) days after the Bid opening, all according to the best interests of the Owner. Any questions concerning this bid shall be directed in writing to: JR Engineering 7200 South Alton Way, Suite C400 Centennial, CO 80112 (720) 270-0728 Attn: Tim Graf Office: 303-267-6184 tgraf@jrengineering.com
Post-Bid
Water / Sewer
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 7, 2022
February 7, 2022
Multiple Locations, Commerce City, CO
Related To This Project
Commerce City, CO
--
Commerce City, CO
--
Commerce City, CO
Bid Date: Jan 27 2022
Commerce City, CO
Bid Date: Feb 21 2022
Commerce City, CO
Bid Date: Jan 20 2022
Commerce City, CO
Bid Date: Feb 11 2022
Commerce City, CO
--
Commerce City, CO
Bid Date: Dec 02 2019
Commerce City, CO
Bid Date: Jan 12 2022
Commerce City, CO
Bid Date: Nov 04 2021
Commerce City, CO
Bid Date: Nov 12 2021
Commerce City, CO
Bid Date: Jan 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.