BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Daytona Beach, Florida. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; transportation facility; and transportation facility.

This project consists of the rehabilitation/reconstruction of Runway 7R-25L and the rehabilitation/reconstruction of Taxiway Sierra and Tango. We have added the rehabilitation of the Sierra and Tango taxiways as this provides a more cohesive and less disruptive project to the users of the airfield as we phase the construction of this project. This project is in response to the findings of the FDOT Statewide Airfield Pavement Management Program Inspection conducted in September 2019. Runway 7R-25L had a Pavement Condition Index (PCI) of 47 which is a rating of poor. However, the Airport has a system in place that maintains the safety of the runways and taxiways through continual observation and repair to the pavements as needed. Additionally, the PCI methodology analyzes an overall measure of the pavement condition and provides an indication of the degree of maintenance, repair, or rehabilitation efforts that will be required to sustain functional pavement. Taxiway Sierra had a PCI ranging from 22 (Serious) to 100 (Good). Taxiway Sierra is in Good/Very Poor condition and is in need of rehabilitation/reconstruction. The PCI range is 28-64. Sierra has an average PCI rating of 61 (Fair). Taxiway Tango has an average PCI rating of 74 (Satisfactory). As of December 15, 2022, this project is currently in the County of Volusia County FY 2022 - 2027 CIP. Funding for this project is allotted in the County's capital improvement plan for construction FY 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Transportation Terminals

$9,000,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
41
Bidding Soon
1,055
All Active Projects
459
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

img_map_placeholder

700 Catalina Dr, Daytona Beach, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.