BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of an educational facility in San Francisco, California. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

The owner has determined a prequalified list of Design-Builders. A Request for Proposals for Design-Builders is expected to be released in April of 2022. The Trustees of The California State University are requesting Statements of Qualifications (SOQ) from interested and qualified design-builders (Respondents) to provide design, preconstruction, and design-build construction services for the above-named Project. The Trustees will select a design-build team consisting of a general contractor and architect (Design-Builder) using a two-step process: (1) this Request for Qualifications (RFQ) from which Respondents may submit SOQ to the Trustees, and (2) the Request for Proposals (RFP) which the Trustees will issue to the shortlisted firms. A technical review committee shall review the respondents' SOQ and, based on the criteria identified in the RFQ, the committee shall select no more than five finalists to receive the Request for Proposals. Selection of the winning Proposer will be based on qualifications and proposed fees (a design competition is not utilized). Collaborative Design-Build is a two-phased delivery process: Design Phase and Design-Build Phase, and the Trustees will issue a separate contract for each phase. The Project consists of: 1)Base Scope: The first program is a new residence hall that provides up to 750 beds of affordable housing for incoming first-year students. The bedrooms should be developed using a "pod" concept approach. The pod concept provides space to socialize, sleep, study and dine within the scope of intimate community grouping. Depending upon the cost, two (2) three bed pods may share a shower and a water closet. If this proves to be too costly, one or more common bathrooms will be provided on each floor as required. Initial studies conducted by the University indicate that this program can be accommodated within a (4) story, 128,000 GSF building. In addition to the bedrooms, the residential portion of the project will include associated activity and study space, office space for the residence hall administration, meeting rooms, recreational areas, and faculty-in-residence apartments. It is also assumed that a dining hall will be constructed on the ground floor of the building. The project will be designed to include gender equity and shall be accessible by residents with a range of abilities. 2) Alternate #1: The second stakeholder is the Student Health Center (SHC) and will be studied as an alternate during schematic design. This department is currently located in an antiquated building near the center of campus, next to the Psychology Building. The SHC serves more students and provides more services than the current space can accommodate, so this project seeks to provide approximately 35,000 GSF for a new facility on the second floor of the new building. The SHC shall have its own dedicated entrance at ground level. It will include an elevator that is separate from those that serve the residence hall. The program shall support a wide range of services, including atriage clinic, health and wellness promotion, examination and treatment rooms, mental health support, and the associated spaces for administrative and medical staff. 3) The height of the building should be limited as required to avoid being classified as a high-rise structure by the California Building Code. Early massing studies conducted by the University indicate the anticipated Base Program and Alternate #1 program can be accommodated within a 5-story structure. The study assumed that first two floors could be approximately 35,000 GSF, while the top three floors could be approximately 31,000 GSF. The new building will be all electric, other innovations such as pre-fabrication and alternative materials may also be considered. Bid Bond 0.00% Payment Bond 100.00% Performance Bond 100.00% San Francisco State University is requesting Statements of Qualifications (SOQ) from interested and qualified design-builders (Respondents) to provide design, preconstruction, and design-build construction services Contractor License Type B Description General Building Contractor Interested participants who contact SF State prior to the deadline will receive a Zoom invitation to the RFQ Conference within 48 hours of the conference time. Phase1 (design and preconstruction services) agreement executed April 18, 2022 Notice of Completion July 1, 2024 Design-Build contract duration 803 calendar days

Under Construction

Educational

$121,728,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
81
Bidding Soon
1,792
All Active Projects
745
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2022

August 21, 2023

img_map_placeholder

Multiple Locations, San Francisco, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.