BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Saint Marys, Georgia. Completed plans call for site work for a playground / park / athletic field.

PROJECT TITLE: INSTALL RAMPS AT TWO HISTORIC STRUCTURES - Cumberland Island National Seashore SITE LOCATION: Cumberland Island National Seashore 101 Wheeler Street St. Marys GA 31558-0806 Install Ramps at Two Historic Structures Product/Service Code: N056 Product/Service Description: INSTALLATION OF EQUIPMENT- CONSTRUCTION AND BUILDING MATERIALS The primary public entrance for the Plum Orchard Mansion is only accessible via stairs. There is an ABA wheelchair lift that doesnot function most of the time and is costly to repair. This project would replace the electric lift and provide continuous access to th e historic mansion by the parks visitors that require ABA access. The Ice House Museum does not meet ABA standards for access to the cooling room for park visitors to get out of the hot, humid weath er. The ABA ramp will replace entrance steps which will allow access to all park visitors. PMIS# 305700A Contact Carl David 912-882-433 9 ext 261 carl_david@nps.gov Submit all questions regarding this solicitation in writing to the Contracting Officer. You must submit questions by January 7, 2022 by 12:00 P.M. EASTERN TIME. Questions submitted after this time may NOT be considered. Answers to the questions submitted in writing will be posted to the solicitation as an amendment on or around January 11, 2022. The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days after receiving the notice to proceed. The time stated for completion shall include final cleanup of the premises. INSTALL RAMPS AT TWO HISTORIC STRUCTURES AT CUMBERLAND ISLAND NATIONAL SEASHORE Legacy Doc #: NPS Period of Performance: 02/07/2022 to 04/07/2022 INSTALL RAMPS AT TWO HISTORIC STRUCTURES AT CUMBERLAND ISLAND NATIONAL SEASHORE Install Ramps at Two Historic Structures at Cumberland Island National Seashore Scope of Work of the Contract includes the expansion of wastewater treatment facilities including the additional of 34-foot diameter concrete clarifier, concrete aeration basin, concrete digester, steel chlorine contact basin and headworks structure

Post-Bid

Playgrounds / Parks / Athletic Fields

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
20
Bidding Soon
530
All Active Projects
208
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2022

February 7, 2022

img_map_placeholder

101 Wheeler St, Saint Marys, GA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.