EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 26, 2022 at 7:00 PM

Updated October 1, 2024

Site work for a mixed-use development in Glen Ellyn, Illinois. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

The College of DuPage is accepting sealed bids for Baseball Field Improvements - Synthetic Turf, Subdrainage, Irrigation and Miscellaneous Concrete. The College of DuPage is committed to the economic development of disadvantaged business enterprises; qualified Minority, Women, and Persons with Disabilities Owned Businesses are highly encouraged to participate College of DuPage Board of Trustees Reserves the right to reject any and all responses. This project is located at East College Road and Park Boulevard, using College 1A parking lot for staging for construction material handling (understanding that it will be protected by the successful bidder). Generally, the work is replacing the existing Baseball Field with turf per attached Smith Group drawings with summary of work. This project includes selective demolition of irrigation and fencing, playing field components, and existing surface materials as indicated per the drawings and specifications. This project includes regrading for turf placement and new playing field components as indicated per the drawings and specifications. Turf graphics to be incorporated into turf per review and approval of COD Athletics. The project is intended to be awarded in late June/early July of 2022 and intended to complete in late October 2022.

Bid Results

Playgrounds / Parks / Athletic Fields

$763,200.00

Public - County

Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
162
Bidding Soon
2,239
All Active Projects
1,091
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2022

February 10, 2022

img_map_placeholder

425 Fawell Blvd, Glen Ellyn, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Baseball Field Improvements - Synthetic Turf, Subdrainage, Irrigation and Miscellaneous Concrete

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.