Site work and paving for a road / highway in Billings, Montana. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The Montana Department of Transportation (MDT) is accepting bids for Overlay and Chip Seal Frontage Rd W of Columbus Billings Area Questions or information relating to either specifications or requirements of this Invitation for Bid shall be asked Electronically 3/4" Commercial Plant Mix Grade S PG 64-28 Quantities are estimated Cold Milling (avg. depth 0.15') Quantities are estimated Type 1 Chips 110, Quantities are estimated Liquid Emulsified Asphalt Grade Quantities are estimated Traffic Control Contractor will provide all labor, equipment, materials, incidentals and traffic control necessary to produce, haul, place, tack and compact approximately 11,850 tons of 3/4 " Commercial Plant Mix Grade S PG 64-28 asphalt mix material. The overlay shall be paved 0.15 feet thick and approximately 24 feet wide. Contractor shall provide all labor, equipment, materials, traffic control and incidentals necessary to produce, haul, place, roll and broom approximately 110,700square yards of laid-in- place chip seal. The chip seal will be approximately 7.7 miles long and 24 feet wide. Contractor shall provide CRS-2P asphalt emulsion and Type 1 chips. Traffic control with pilot cars must be maintained until dusk or fading light each workday as determined by the Project Manager. The emulsion application rate for chip seals is estimated at 0.42 gallons per square yard. The cover material application rate is estimated at 25 pounds per squareyard. Actual application rates will be based on the chip design and the actual field adjustments. If the cover material application rate of 25 pounds per square yard is not sufficient to provide a quality job, the Project Managers will jointly determine what the new application rate should be. Contractor must furnish a water truck for dust control and wetting of chips. Arrangements must be made by the Contractor for acquiring water for wetting and sweeping. Completion- AUGUST 31, 2022 Question Submission Close Date 12/29/2021 2:00 PM MST
Award
Roads / Highways
$1,375,090.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 4, 2022
March 7, 2022
S Frontage Rd, Billings, MT
Related To This Project
Billings, MT
Bid Date: Jan 18 2022
Billings, MT
Bid Date: Jan 18 2022
Billings, MT
Bid Date: Jan 10 2022
Billings, MT
Bid Date: Feb 24 2022
Billings, MT
Bid Date: Feb 22 2022
Billings, MT
Bid Date: Feb 22 2022
Billings, MT
--
Billings, MT
Bid Date: Jun 09 2020
Billings, MT
--
Billings, MT
Bid Date: Jan 25 2022
Billings, MT
Bid Date: Apr 27 2021
Billings, MT
Bid Date: Jan 27 2022
Billings, MT
Bid Date: Nov 11 2021
Billings, MT
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.