BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2024 at 8:00 PM

Updated April 11, 2024

Site work, paving and new construction of a bridge / tunnel in Barrington, New York. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

CR Number: 2106118 The project consists of replacing the existing bridge carrying Haley Road over Big Stream with a new prestressed adjacent box beam superstructure. The superstructure will be supported on cast-in place concrete integral abutments founded on CIP piles. Approximately 530 feet of approach highway will be reconstructed as part of the project. Traffic will be maintained on an off-site detour during construction. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 5.9% Women Owned Sub-Contracting Goal: 6.9% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Disadvantaged Owned Sub-Contracting Goal: 5.0% Questions regarding the Contract Documents should be directed to Wendell Buckman, P.E., Barton & Loguidice, D.P.C. either through email at: wbuckman@bartonandloguidice.com or by telephone at 315-457-5200. Bidders shall promptly notify Wendell Buckman of any errors, omissions, conflicts or ambiguity within the Contract Documents within 7 days of bid opening. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the Plans and described in these Specifications including, but not necessarily limited to the following: The project consists of replacing the existing bridge carrying Haley Road over Big Stream with a new prestressed adjacent box beam superstructure. The superstructure will be supported on castin place concrete integral abutments founded on CIP piles. Approximately 530 feet of approach highway will be reconstructed as part of the project. Traffic will be maintained on an off-site detour during construction.

Award

Bridges / Tunnels

$874,771.00

Public - County

New Construction, Paving, Site Work

41

8

2

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
115
Bidding Soon
1,770
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

April 29, 2024

Project location map

Haley Hill Rd, Barrington, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.