Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 10, 2024 at 8:00 PM
Updated April 11, 2024
Site work, paving and new construction of a bridge / tunnel in Barrington, New York. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
CR Number: 2106118 The project consists of replacing the existing bridge carrying Haley Road over Big Stream with a new prestressed adjacent box beam superstructure. The superstructure will be supported on cast-in place concrete integral abutments founded on CIP piles. Approximately 530 feet of approach highway will be reconstructed as part of the project. Traffic will be maintained on an off-site detour during construction. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 5.9% Women Owned Sub-Contracting Goal: 6.9% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Disadvantaged Owned Sub-Contracting Goal: 5.0% Questions regarding the Contract Documents should be directed to Wendell Buckman, P.E., Barton & Loguidice, D.P.C. either through email at: wbuckman@bartonandloguidice.com or by telephone at 315-457-5200. Bidders shall promptly notify Wendell Buckman of any errors, omissions, conflicts or ambiguity within the Contract Documents within 7 days of bid opening. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the Plans and described in these Specifications including, but not necessarily limited to the following: The project consists of replacing the existing bridge carrying Haley Road over Big Stream with a new prestressed adjacent box beam superstructure. The superstructure will be supported on castin place concrete integral abutments founded on CIP piles. Approximately 530 feet of approach highway will be reconstructed as part of the project. Traffic will be maintained on an off-site detour during construction.
Award
Bridges / Tunnels
$874,771.00
Public - County
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 29, 2024
April 29, 2024
Haley Hill Rd, Barrington, NY
Related To This Project
Castile, NY
Bid Date: Mar 21 2024
Hauppauge, NY
--
Jamestown, NY
Bid Date: Mar 05 2024
Syracuse, NY
Bid Date: Mar 04 2024
Fishkill, NY
Bid Date: Feb 29 2024
East Aurora, NY
Bid Date: Apr 17 2024
Depew, NY
--
Amherst, NY
--
New York, NY
--
Yonkers, NY
Bid Date: Mar 15 2024
N Merrick, NY
Bid Date: Mar 14 2024
Callicoon, NY
Bid Date: Mar 28 2024
Elmsford, NY
Bid Date: Feb 22 2024
Penfield, NY
--
Bay Shore, NY
Bid Date: Mar 05 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
