EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 6, 2022 at 7:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Dearborn, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and water / sewer project.

Bids are being solicited for Water Main Replacement and Asphalt Street Resurfacing 2022 - Phase III Complete all water main and sewer activities by maintaining temporary pavement as specified. o Perform roadway excavation in 500 feet length; to be immediately followed by the underdrain installation for the 500 feet length and connection to the catch basins; to be immediately followed by proof rolling and subgrade under cutting as determined by the Engineer and 6 inch aggregate base placement if specified. The sequence will minimize rain water seepage and its accumulation within the pavement surface. The contractor shall be responsible for any additional subgrade undercutting required prior to the concrete paving. o Follow above described sequence in 500 feet segments for the remainder of the street. Do not perform roadway excavation in excess of 500 feet in length without placement of underdrains, subgrade undercutting and 6 inch aggregate base. o Concrete paving. The concrete paving forms shall be removed and hauled away from the street within seven (7) days of concrete pour in order for the property owners to use the street while no active construction is performed in front of their houses.*Concrete paving of intersections and gaps shall be completed within two weeks of concrete pour of Main Street to provide for contiguous access to traffic including garbage and recycle collecting trucks.** o Backfill excavation at least four (4) feet wide between the new curb and sidewalk/driveways for the property owners to access their houses within two (2) days after removing the concrete paving forms.* o Driveway/Sidewalk /lawn restoration. Question Acceptance Deadline 01/05/2022 05:00 PM EST Questions are submitted online No General Requirements - Bid Deposit Required - Insurance Required - License Required - FOB Destination

Post-Bid

Water / Sewer

$850,000.00

Public - City

Paving, Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
140
Bidding Soon
1,426
All Active Projects
728
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2022

March 16, 2022

img_map_placeholder

Multiple Locations, Dearborn, MI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.