BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a playground / park / athletic field in Santee, California. Completed plans call for site work for a playground / park / athletic field.

Any questions relating to this project should be directed to Steven Miller, P.E. at SMiller@CityofSanteeCA.gov All questions concerning this RFP must be submitted in writing and received no later than 5:00pm on January 21, 2022. Questions must be directed to: Steven Miller, P.E Senior Civil Engineer City of Santee 10601 Magnolia Avenue Santee, California 92071 (619) 258-4100 ext. 176 Email: smiller@cityofsanteeca.gov Anticipated Award of Contract February 23, 2022 Notice to Proceed Issued March 14, 2022 Preliminary Design Completion April 14, 2022 Project to be Fully Complete September 30, 2022 This meeting will be held at Weston Park, 9050 Trailmark Way, Santee, CA 92071. Allow approximately one (1) hour and bring a complete RFP packet for reference. Due to COVID19, attendees will be required to practice social distancing and wear face masks during the pre-proposal meeting. Proposers will be responsible for verifying and inspecting the Project site prior to submitting a proposal and will assume full responsibility for having familiarized themselves with the locality and local conditions that may in any manner affecting the work to be done. Submission of a proposal shall be prima facie evidence that the Proposer has made such examination and is satisfied as to the conditions to be encountered in performing the work and as to the requirements of this contract. The City of Santee complies with the Americans with Disabilities Act. If you require reasonable accommodations for the pre-proposal meeting, please contact the Office of the Director of Development Services at (619) 258-4100 extension 168, at least 48 hours prior to the meeting.

Award

Playgrounds / Parks / Athletic Fields

$217,882.00

Public - City

Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
37
Bidding Soon
1,009
All Active Projects
459
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2022

May 2, 2022

img_map_placeholder

9050 Trailmark Way, Santee, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.