BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Pontiac, Illinois. Contact the soliciting agency for additional information.

Notice is hereby given that Pontiac Township HSD 90 (the "District") at 1100 Indiana Ave., Pontiac, IL 61764, is requesting Qualified Providers to propose energy conservation measures through a guaranteed energy savings contract. The District's objective in issuing this Request for Proposal (RFP) is to provide a competitive means in which to select a qualified provider for a Guaranteed Energy Savings Contract under a phased approach for all buildings. The contract shall follow the requirements of Article 19b of the Illinois School Code.For questions contact John Tibbs, the District's Director of Maintenance, jtibbs@pontiac90.org. Proposals shall include implementation of energy conservation measures. "Energy conservation measure" means any improvement, repair, alteration, or betterment of any building or facility owned or operated by the school district or any equipment, fixture, or furnishing to be added to or used in any such building or facility, subject to the building code, that is designed to reduce energy consumption or operating costs. The District reserves the right to reject any or all proposals, to waive irregularities in the proposal procedure, or accept the proposal that, in its opinion, will serve the best interest of the School District. The District further reserves the right to award all or a portion of the work to one or more providers. Any such decision shall be considered final. Failure to meet any of the required criteria may result in automatic rejection of the proposal. The District will not provide compensation to the Respondent(s) for any expense incurred by the Respondent(s) for Submission preparation, product evaluations, or demonstrations that may be made. All submissions become the property of the District and will not be returned to the ESCO. In accordance with Article 19b of the Illinois School Code, the District discloses that GRP|WEGMAN participated in the preparation of this RFP. The method of Contractor Selection has not been Determined at this time.

Conceptual

Municipal

Public - State/Provincial

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
96
Bidding Soon
1,318
All Active Projects
608
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2022

img_map_placeholder

Multiple Locations, Pontiac, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.