Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Center Township, Indiana. Completed plans call for site work for a water / sewer project.
As of March 9, 2022, the project has been awarded to Gough, Inc for $249,290.74. A timeline for construction has not been confirmed. Porter Co. Storm Water Management Board, the Porter Co. Department of Development & Storm Water Management is seeking sealed bids for the project designated as Hidden Hollow Subdivision - Storm Water Management System Improvements, Phase 1. The project is located south of CR 150 N, between CR 150 W and CR 250 W, in Hidden Hollow Subdivision. The subdivision is located in Sections 33 and 34, Township 35 North, Range 6 West, in Center Township, Porter County, Indiana. The project consists of the reconstruction of a failed drain tile that serves as the outlet for the storm water infrastructure serving the Hidden Hollow Subdivision. The overall purpose of the project is to enhance the storm water management services provided to the surrounding property owners by improving the area's storm water infrastructure. The project includes the installation of storm sewer, via open trench construction, including stripping topsoil, excavation, bedding, laying storm sewer, placing initial backfill, haunching, placing final backfill, replacing topsoil, shaping, trimming, and finishing, and cleaning, inspecting, and testing; installation of storm sewer structures, including stripping topsoil, excavation, bedding, setting precast reinforced drainage structures, placing adjusting rings and castings, backfilling, replacing topsoil, shaping, trimming, and finishing, and cleaning. The project also includes other items incidental to the work, including clearing and tree removal, erosion and sediment control, and the restoration of areas disturbed during the performance of the work. The work includes the carrying out of all duties and obligations and the furnishing of all labor, material, tools, equipment, and other incidentals necessary or convenient to the successful completion of the project *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.
Award
Water / Sewer
$249,291.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better projects. Build better bids. Win.
Elevate your business with the top source for commercial construction data. Get instant access to Project Search, and five free projects and companies. Subscribe for complete access to all contacts and documents to unlock opportunities and start winning more business today!
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
January 25, 2022
February 24, 2022
Multiple Locations, Center Township, IN
Related To This Project
Center Township, IN
--
Center Township, IN
--
Center Township, IN
--
Center Township, IN
Bid Date: Sep 14 2022
Center Township, IN
Bid Date: Mar 15 2023
Center Township, IN
Bid Date: Jul 19 2023
Center Township, IN
--
Dyer, IN
Bid Date: Feb 08 2022
Cedar Lake, IN
Bid Date: Feb 15 2022
Valparaiso, IN
Bid Date: Jun 07 2022
Crown Point, IN
Bid Date: Mar 09 2022
Valparaiso, IN
--
West Lafayette, IN
Bid Date: Dec 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--