BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Fredericksburg, Virginia. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Deadline to submit questions 5/20/22 by 4:00 P.M. The City will respond to questions 5/27/22 Anticipated Award Date: October 2022 Final Completion: Not later than December 2023. The scope of work to be undertaken by the Design-Builder under the design-build contract for this Project will be identified in the RFP. This work includes, among other matters, all work required to support the design and construction of: (a) survey; (b) structure and/or bridge; (c) environmental; (d) geotechnical; (e) traffic control devices; (f) transportation management plan (including but not limited to traffic management and pedestrian detour plans); (g) utilities; (h) quality assurance and quality control; (i) signage and lighting; (j) construction engineering and inspection; and (k) overall Project management. Environmental work shall address all items necessary for the acquisition of all land use and water quality permits for the Project, as well as any erosion and sediment control plans, minor site plans, major site plans, Right-of-Way Use & Special Excavation Permits, and any other required permits, as necessary. Further, Offeror and all subcontractors must obtain City Business Licenses or Waivers thereof (from the Commissioner of Revenue) should they be awarded the contract. Utility work includes all items necessary to perform the coordination of utility relocation as needed to allow for completion of the scope of work. Construction engineering and inspection work includes all items necessary for providing quality assurance and quality control in accordance with VDOT's Minimum Requirements for Quality Assurance and Quality Control for Design-Build and Public-Private Transportation Act Projects, revised July 2018. Coordination with all third-party stakeholders is the responsibility of the Design-Builder

Post-Bid

Bridges / Tunnels

$200,000.00

Public - City

Demolition, New Construction, Paving, Site Work

7

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
72
Bidding Soon
1,914
All Active Projects
771
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2022

October 6, 2022

img_map_placeholder

To Be Determined, Fredericksburg, VA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.