Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Houston, Texas. Completed plans call for the renovation of a educational facility.
As of 2/28/2022 project was not yet been awarded. Project will be awarded at the March 10th Board meeting. Location - Kirk ES: 12421 Tanner Rd., Houston, TX 77041 Reeds ES: 8700 Tami Renee Ln., Houston, TX 77040 The Owner reserves the right to reject any and all proposals and to waive any informality in the Competitive Sealed Proposal process. No proposal shall be withdrawn within sixty (60) days after the proposal opening without the specific consent of the Owner. Refer to Offerors Section Document AB. A Proposal Bond from a bonding company acceptable to the Owner or a certified check in an amount equal to 10% of the greatest amount proposed must accompany each offeror's proposal. A Payment Bond and Performance Bond, each in an amount equal to 100% of the Contract Sum conditioned upon the faithful performance of the Contract will be required. Refer to Section AB, Instructions to Offerors for detailed Bond requirements. Subcontractors and Suppliers intending to submit proposals to General Construction Offerors are required to prepare their proposals based on a complete set of proposal documents. If after reviewing the complete set of proposal documents, Subcontractors and Supplier Offerors desire to purchase individual drawings and specification sections for their proposal convenience, they may do so by ordering the specific drawings and specifications directly from the reproduction company. Each offeror purchasing a partial set of proposal documents is responsible for determining exactly which documents he requires and is responsible for all costs associated with printing and delivery. Subcontractors and Suppliers exercising this option must agree to do so on the basis that 1) all documents shall be returned to the Architect, without refund, after submitting a proposal and 2) documents shall not be used on other construction projects. Successful Subcontractors and Supplier Offerors may retain their Proposal Documents until completion of the construction. The subcontractor/supplier is responsible for all the associated work and coordination when not obtaining a complete set of drawings.
Post-Bid
Educational
$18,144,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 10, 2022
April 11, 2022
Multiple Locations, Houston, TX
Related To This Project
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Feb 24 2022
Houston, TX
Bid Date: Feb 28 2022
Houston, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.