BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Castle Rock, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000276029 Source ID PU.AG.USA.1476.C5810201 Question Acceptance Deadline 01/12/2022 06:30 PM EST Questions are submitted online No General Description - The work to be performed under this contract includes removal and replacement of existing concrete including concrete pavement, crosspan, sidewalk, curb and gutter, curb ramps, asphalt patching, various depths and types of milling of existing asphalt pavement, and various thicknesses of asphalt paving within the streets listed in the Appendices or as directed by the Project Manager. The Contractor shall supply all labor, equipment, and materials necessary to complete the work in accordance with these specifications. The contract shall be awarded based on bids received for the base bid schedule A and the contract documents. Night work shall be required and entail asphalt patching, asphalt milling, and asphalt overlay on 5th Street, between Wilcox Street and Rock Street. All locations shall be completed before June 1, 2022. Contractor will be required to coordinate construction activities with adjacent 1businesses, trash removal companies, school district, HOA, Metro Districts, and other Town maintenance projects if applicable. The contractor shall commence work no later than three (3) calendar days from, and including, the date of the Notice to Proceed, and be construction complete (punchlist items, cleanup, and demobilize) within one hundred and ten (110) working days from the date on the Notice to Proceed. If "Construction Completion" is not issued within the allotted contract time for the original scope of work, "Liquidated Damages" shall be assessed. When contract work is complete, the contractor shall commence work on punchlist items, cleanup, and demobilizing regardless of contract time remaining. Work shall take place between April 11, 2022 and September 2, 2022. A schedule of sequencing of all work shall be submitted at or before the project pre-construction meeting, and approved by the Town prior to issuance of Notice to Proceed

Post-Bid

Sidewalks / Parking Lot

$3,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
34
Bidding Soon
940
All Active Projects
392
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2022

April 11, 2022

img_map_placeholder

Multiple Locations, Castle Rock, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.