BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Castle Rock, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of February 3 the project is set to be awarded mid of April.. The Town of Castle Rock (the "Town") is soliciting CMGC services for the Crystal Valley Interchange Project (the "Project"). The Project consists of the following bridges/culverts and roadways: Crystal Valley Pkwy over I-25 Crystal Valley Pkwy over Burlington Northern and Santa Fe (BNSF) Railroad North Bound I-25 on ramp over Douglas Run Drainage East Frontage Rd over Douglas Run drainage Crystal Valley Pkwy from existing bridge structure at Plum Creek to interchange Crystal Valley Pkwy from interchange to Dawson Ridge Blvd Relocation of the East Frontage Rd Connection stubs to Dawson Ridge Blvd On/Off ramps for north bound I-25 On/Off ramps for south bound I-25 A full interchange will be constructed at I-25, and complete intersections at the East Frontage Rd. and the relocated West Frontage Rd./Dawson Ridge Blvd. The selected Proposer (also referred to as "Contractor") will provide preconstruction phase Construction Management ("CM") services and will have the opportunity to be selected as the General Contractor ("GC") during the construction phase. However, the construction contract is not guaranteed, and is dependent on successful Construction Agreed Price (CAP) negotiation with the Town for the various individual construction packages anticipated for this Project that will take into consideration the annual available funding for the Project. The funding for the full Project has not been fully identified at this time which requires the Town to take a holistic approach to identify proactive measures to deliver as much of the Project Scope Elements with available funding, while maintaining synchronicity with future funding allotments. General Requirements - Insurance Required - Bidder Prequalification/Preregistration Required

Post-Bid

Roads / Highways

$20,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
34
Bidding Soon
940
All Active Projects
392
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2022

September 5, 2022

img_map_placeholder

I-25, Castle Rock, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.