BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Milton, Illinois. Completed plans call for site work for a water / sewer project.

The Village of Milton, located in Pike County Illinois is seeking bids for the completion of a replacement well and the sealing of an existing water supply well. The project shall generally consist of the following: 1) Preparation of engineering plans and specifications for acquisition of a construction permit from the Illinois EPA and completion of all requirements necessary to obtain a construction permit. 2) Construction of the new 8" well with 15 feet of 8" telescope screen constructed into a fractured limestone formation. 3) Development and testing of the well at 75 GPM for 24 hours followed by 90% recovery readings. 4) 5 Ft. Precast valve vault, 2" flowmeter, 4" check valves, 4" gate valve and sampling device. 5) Pipeline and connection to existing 4" raw water line. 6) Removal of pumping equipment from Well No. 5 with any defective parts replaced as required and installation in new well. 7) Installation of an 8" x 10" Baker pit-less adapter and submersible pumping equipment. 8) Connection to existing electric controls, supply and install NEMA 3R disconnect box near well along with conduit and wire to new well. 9) Water sampling and testing as required by IEPA. 10) Sealing of existing well with bentonite and neat cement grout due to failed casing. 11) Obtain operating permit from the IEPA at completion of well. 12) Submit well sealing documents to IDPH, IEPA and ISWS. All work must be preformed to workmanlike standard by licensed Illinois Department of Public Health Well and Pump Installation contractors and all new components must be of standard commercial grade quality and preform to industry standards upon installation. All contractors submitting a bid shall provide a list of all design build public water supply wells completed in the 5 years. The Village of Milton reserves the right to reject any or all bids and to waive any formality or irregularity and to require evidence of qualifications, including references, prior to award of contract.

Post-Bid

Water / Sewer

$250,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
95
Bidding Soon
1,365
All Active Projects
579
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 10, 2022

February 10, 2022

img_map_placeholder

To Be Determined, Milton, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.