BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving, outdoor lighting and new construction of a mixed-use development in Mendota, California. Completed plans call for the construction of a educational facility; for site work for a educational facility; for outdoor lighting for a educational facility; for paving for a educational facility; playground / park / athletic field; playground / park / athletic field; playground / park / athletic field; playground / park / athletic field; road / highway; road / highway; road / highway; and road / highway.

McCabe Elementary School-Modular Buildings and Site Improvements- Replacement of existing classroom buildings with new Modular construction Classroom buildings, new site lighting, field lighting, and pavement at McCabe Elementary School. All bidders will be deemed to have notice of all conditions and information, including, but not limited to any conditions in, at, and about the site, the building or buildings, if any, and any work that may have been done thereon. If a bid bond is used, it must be issued by an Admitted Surety (an insurance organization authorized by the Insurance Commissioner to transact surety insurance in the State of California during this calendar year), which shall be given as a guarantee that the bidder will enter into a Contract if awarded the Work and will be declared forfeited, paid to, or retained by the Owner as liquidated damages if the bidder refuses or neglects to enter into the Contract provided by the Owner after being requested to do so. The surety insurer must, unless otherwise agreed to by Owner in writing, at the time of issuance of the bond, have a rating not lower than "A-" as rated by A.M. Best Company, Inc. or other independent rating companies. Owner reserves the right to approve or reject the surety insurer selected by Contractor and to require Contractor to obtain a bond from a surety insurer satisfactory to the District. The successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum, said bonds to be secured from Admitted Surety insurers (an insurance organization authorized by the Insurance Commissioner to transact business of insurance in the State of California during this calendar year). The surety insurers must, unless otherwise agreed to by Owner in writing, at the time of issuance of the bonds, have a rating not lower than "A-" as rated by A.M. Best Company, Inc. or other independent rating companies. Owner reserves the right to approve or reject the surety insurers selected by Contractor and to require Contractor to obtain bonds from surety insurers satisfactory to the Owner. The bidder will be required to furnish insurance as set forth in the Contract Documents. The Owner will not consider or accept any bids from contractors who are not licensed to do business in the State of California, in accordance with the California Public Contract Code, providing for the licensing of contractors. In accordance with Section 3300 of said Code, the bidder shall have a Class "B" license and shall maintain that license in good standing through Project completion and all applicable warranty periods. Bidder shall state the license number on the Designation of Subcontractors form for all subcontractors doing more than one-half of one percent (0.5%) of the bidder's total bid. Owner reserves the right to reject any bid if a listed subcontractor is not licensed at the time bidder's bid is submitted to Owner. The Director of Industrial Relations of the State of California, in the manner provided by law, has ascertained the general prevailing rate of per diem wages and rate for legal holidays and overtime work. The Contractor must pay for any labor therein described or classified in an amount not less than the rates specified. Copies of the required rates are on file at the Owner's business office and are available to any interested party on request. (a) No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. (b) No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. (c) This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. (d) Please provide your DIR registration number with your bid Proposal, bids without this DIR registration number your bid will be subject to rejection. Contractors and their employees shall comply with the Michelle Montoya School Safety Act, Section 45125.2 of the Education Code. Refer to Section 00 62 50 - Fingerprinting Requirements. The Owner reserves the right to waive any irregularity and to reject any or all bids. Unless otherwise required by law, no bidder may withdraw its bid for a period of thirty (30) days after the date set for the opening thereof or any authorized postponement thereof. The Owner reserves the right to take more than thirty (30) days to make a decision regarding the rejection of bids or the award of the Contract. a. Preparation of foundation/building pad for modular building. b. Site excavation/ compaction. c. Site utilities. d. Concrete paving and walks. e. Site power distribution and connection to modular building electrical panel. f. Modular Building Fire Alarm and low voltage. g. Below grade utilities (plumbing to be stubbed up +4" AFF). h. Connection/coordination of site utilities to points of connections of modular buildings. i. Building signage. j. Coordination with work of Modular Building contract.

Post-Bid

Educational

$520,000.00

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
29
Bidding Soon
467
All Active Projects
198
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2022

February 14, 2022

img_map_placeholder

250 Derrick Ave, Mendota, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.