EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 19, 2024 at 8:00 PM

Updated March 20, 2024

Renovation of an educational facility in Champaign, Illinois. Completed plans call for the renovation of a educational facility.

Project includes both the complete replacement of existing fire alarm systems at Foellinger Auditorium and English Building, and fire alarm system upgrades at the National Soybean Research Center and Madigan Lab (four buildings total). Work shall include demolition and either entirely new fire alarm systems (at Foellinger and English) or new fire alarm devices and associated programming (at NSRC and ERML), including initiation, automatic detection, and occupant notification. New systems shall integrate or supervise the existing building mechanical and fire protection (sprinkler) systems, as well as elevator and other indicated systems. New systems shall be manufactured by Siemens and shall be Cerberus Pro Modular series per campus standard. The Owner reserves the right to reject any or all bids or any part thereof, to waive any informalities in the bidding, and to accept the bids deemed to be in the best interests of the Owner after all bids have been examined and evaluated. Alternates, if considered, will be accepted in any order as determined by the Owner. The following certification is applicable for contractors and subcontractors only. Pursuant to the Prevailing Wage Act, Vendor shall pay a wage of no less than the general prevailing hourly rate as paid for work of a similar character in the locality in which the work is performed, to all laborers, workers and mechanics, pursuant to definitions, guidelines and procedures set forth in 820 ILCS 130/0.01 et. seq. (2010).

Award

Educational

$2,210,110.00

Public - State/Provincial

Renovation

51

16

3

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Duct Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Raceway and Boxes for Electrical Systems, Low-Voltage Electrical Distribution, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
46
Bidding Soon
554
All Active Projects
206
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2023

August 31, 2023

img_map_placeholder

Multiple Locations, Champaign, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.