EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 22, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Jenkintown, Pennsylvania. Completed plans call for the renovation of a educational facility.

The School District of Jenkintown will be receiving sealed bids for the Jenkintown School District's '2022 Summer Work' Project in accordance with the Bidding Documents prepared by Godshall Kane O'Rourke (GKO) Architects, 300 Brookside Avenue, Building 18, Suite 150, Ambler, Pennsylvania, 19002. The project involves the complete renovations of (6) Toilet rooms as well as a classroom renovation and two gymnasiums. Work includes but is not limited to renovations of existing spaces, new related finishes, fixed casework, new bathroom fixtures and accessories, new mechanical HVAC systems, and lighting systems. TYPE OF BIDS: Separate Fixed-Fee Bids (for General Construction Contract, HVAC Construction, Plumbing Construction and Electrical Construction) will be received for the work. BID SECURITY: Bids shall be accompanied by bid security in the form of a certified check, cashier's check or bid bond in an amount of ten percent (10%) of the Base Bid submitted, made payable to the Owner, as a guarantee that the Bidder will, if awarded the Contract, enter into a Contract with the Owner in accordance with Bid submitted and the Contract Documents. COMMENCEMENT: Onsite construction work may commence on June 20, 2022. All Contractor procurement, submittal reviews, and administrative work may commence as soon as a Contract has been awarded, and the submitted bonds and insurance certificates to the Owner's Representative have been approved. BONDING REQUIREMENTS: Each Prime Contractor will be required to provide a Performance Bond and a Payment Bond, each in the amount of 100-percent (100%) of the Contract Amount. OWNERS RIGHTS: Owner reserves the right to reject a Bid which is incomplete or irregular, the right to wave informalities or irregularities in a Bid received, and the right to accept a Bid which is in the Owner's judgment as the Owner's best interests. WAGE DETERMINATION REQUIREMENTS: Contract is subject to compliance with the applicable Schedule of Prevailing Wages Rates, in accordance with the Pennsylvania Prevailing Wage Act, issued by the Commonwealth of Pennsylvania Department of Labor and Industry. Prospective bidders may also make arrangements for additional visits to the project site by contacting Mike Nickerson. Please be advised that Covid safety protocols may be in place.

Post-Bid

Educational

$300,000.00

Public - City

Renovation

44

22

17

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Administrative Requirements, Project Management and Coordination, Project Coordination, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Maintenance Data, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Steep Slope Roofing, Roof Tiles, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Hardware, Door Hardware, Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Piping Specialties, Domestic Water Pumps, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, Flexible Ducts, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Ventilators
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices

Find More Local Projects

Within 75 Miles of This Project
483
Active Projects
256
Bidding Soon
4,357
All Active Projects
2,036
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2022

June 20, 2022

img_map_placeholder

Multiple Locations, Jenkintown, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Summer 2022 Work - Renovation of HS Restrooms, Classrooms & ES Gym for The School District of Jenkintown

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.