EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 6, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a civil project in Jenkintown, Pennsylvania. Completed plans call for site work for a bridge / tunnel.

The contract duration is 609 calendar days from the notice to proceed. The "Work includes but is not limited to: the Jenkintown Stream Restoration near the Jenkintown-Wyncote Train Station and includes the following: Bridge 0.16, Baeder Run Stream Restoration, Baeder Run Flood Storage Basin, Tacony Creek Stream Restoration, Bridge 10.97 and Bridge 11.22. All questions must be submitted by Tuesday, April 19, 2022 at 12:00 pm to be guaranteed an answer. Any inquiries regarding this bid and any request for change, modification, or clarification of any aspect of these Contract Documents must be made in writing to SEPTA at least eight (8) calendar days prior to bid opening in order for consideration to be given by SEPTA to affect a change in the Contract Documents. Any inquiries regarding this bid must be directed to Racquel Burden of the Procurement, Supply Chain and DBE Division at rburden@septa.org or (215) 580-8316. A change, modification, or clarification to the Contract Documents can only by affected by a written Addendum issued by SEPTA via our ePS. All bids must be submitted through SEPTA's Electronic Procurement System (EPS). Mailed or hand delivered bids will be rejected. The Bid will be opened electronically on the scheduled Opening Date/Time and will be secure and unreadable by SEPTA until that time. Attendance at the Bid Opening meeting is not mandatory. No bid will be opened and considered that is submitted later than the time specified. SEPTA retains the right to reject any and all bids, as determined to be in the best interest of SEPTA Each bid submitted shall remain firm for at least ninety (90) days from the date of the Bid Opening and may not be withdrawn in whole or in part during that time. By submitting a bid, the bidder certifies that the bid price is held firm for that time and any extension thereof. SEPTA, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4, and Title 49,Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in regard to any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation, and will not be discriminated against on the grounds of race, sex, color, or national origin in consideration for an award. Contractor will be required to comply with all applicable Equal Employment Opportunity laws and regulations. All bidders will be required to certify compliance with Executive Order 12549 (ineligible contractors). Any contract issued as result of this solicitation is subject to a financial assistance contract between SEPTA and U.S. Department of Transportation.

Bid Results

Bridges / Tunnels

$9,372,350.00

Public - State/Provincial

Site Work

60

14

14

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Construction Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Roofing and Siding Panels, Siding
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Tiling, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Exterior Specialties, Protective Covers, Canopies
Division 12 - Furnishings

Division 12 - Furnishings

Art
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Concrete Curbs and Gutters, Site Improvements, Retaining Walls, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
501
Active Projects
286
Bidding Soon
4,524
All Active Projects
1,969
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2022

June 27, 2022

img_map_placeholder

2 Greenwood Ave, Jenkintown, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Jenkintown Stream Restoration

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.