BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2025 at 8:00 PM

Updated July 16, 2025

Site work, paving and renovation of a mixed-use development in Cannon Beach, Oregon. Working plans call for the renovation of a one-story above grade municipal facility; 13,500-square-foot, one-story above grade educational facility; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of July 15, 2025, the project was voted down by the community and has been sent back for redesign. A design team and construction manager have been identified. Design has been going on for several years. They are getting ready to resubmit the project to the city council and are accepting community input. A firm bidding and construction timeline is not available. The City of Cannon Beach is seeking proposals to provide Construction Manager/General Contractor (CM/GC) Services for the renovation of a City-owned property at 268 Beaver Street, known as Cannon Beach Elementary School. The City is requesting proposals in accordance with the Oregon Attorney General's model rules that govern the CM/GC delivery method. The redevelopment of this property includes the classroom building and a gymnasium structure on the property. The site is approximately 1.6 acres in size and site work is expected to occur on the entire site. Project Description The City's intended use of the property upon redevelopment is to become a tourism related facility that will primarily serve visitors and tourists to Cannon Beach. The City also intends to use the redeveloped property as a space for community-related events when not being used for tourism purposes. There are two structures to be renovated. The largest is a 7500 square foot wood-construction arch frame structure gymnasium. The second is 5000 square foot, one story concrete masonry unit block and wood-frame structure with four - 1000 square foot classrooms and ancillary office space. The structures have been out of use for at least 8 years and had limited maintenance for several years prior to that. A high grade of restoration of the building's envelopes, structural components and mechanical systems will be critical for the success of the project. For planning and design purposes the site is approximately 1.6 acres. The city desires to incorporate walking trails, interpretive signs, displays, planted areas, historically accurate structures, and presentation sites into the project, and therefore site work is expected to occur on the entire site. Prevailing Wage / Public Works The Oregon BOLI Prevailing Wage Rates applicable to this project are the rates in effect at the time construction begins, either through an amendment establishing early work or an amendment establishing a guaranteed maximum price ("GMP"), whichever occurs first. Those rates will then apply throughout the project. Single Point of Contact Address all concerns or questions regarding this solicitation to Jennifer Barrett, Contract Coordinator

Pre-Construction/Negotiated

Educational

$12,400,000.00

Public - City

Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
68
Bidding Soon
987
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2022

July 15, 2027

Project location map

268 Beaver St, Cannon Beach, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.