EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 19, 2022 at 8:00 PM

Updated January 25, 2024

Site work and paving for a mixed-use development in Cannon Beach, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Est. Value Notes:100,000 - 150,000. ADA Curb Ramps, Sawcutting/Sidewalk/Pavement, Traffic Control, Paving (Asphalt or Concrete), Sidewalks/Curbs/Gutters, Stormwater Improvements, Street/Road Pavement Marking, Landscaping. Description:Pedestrian safety and traffic flow at the intersection of Warren and Hemlock is not currently adequate. Existing temporary traffic and pedestrian infrastructure will be removed and replaced with permanent infrastructure. New facilities will include reconfigured traffic lanes, the addition of sidewalks including ADA compliant ramps, additional road striping, and landscaping. The presence of permanent facilities will provide clear and safe intersection operation by directing pedestrians for safe passage and providing clear expectations from, and for, drivers. All improvements will be constructed to the current City and ODOT standards.

Award

Sidewalks / Parking Lot

$118,209.00

Public - City

Paving, Site Work

18

11

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Unit Prices, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Cleaning and Waste Management
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
28
Bidding Soon
699
All Active Projects
288
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2022

February 24, 2022

img_map_placeholder

US-101, Cannon Beach, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.