BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2022 at 7:00 PM

Updated April 4, 2025

Site work and paving for a mixed-use development in San Francisco, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Work is located at various locations in the Sunset District, Telegraph Hill, and Financial District of San Francisco, California and consists of pavement renovation, curb ramp construction, sewer replacement, traffic control, and all related work. https://teams.microsoft.com/dl/launcher/launcher.htmlurl=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_NzkyM2I0NWMtODIzOS00NjNhLTlmZWEtODIzZGJhZmY5Njlm%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%252222d5c2cf-ce3e-443d-9a7f-dfcc0231f73f%2522%252c%2522Oid%2522%253a%252292807caf-3d09-47a6-8678-14c6357c04f1%2522%257d%26CT%3D1639694360023%26OR%3DOutlook-Body%26CID%3DA64521D7-44CB-4A1D-9261-9676555CC340%26anon%3Dtrue&type=meetup-join&deeplinkId=07f42ff8-4860-44a8-81e5-49c0a11d250a&directDl=true&msLaunch=true&enableMobilePage=false&suppressPrompt=true 575 consecutive calendar days from NTP to substantial completion. A corporate surety bond or certified check for ten percent (10%) of the amount bid must accompany each bid. Administrative Code Section 6.22(a) requires all construction greater than $25,000 to include performance and payment bonds for 100% of the contract award 1) Class "A" license required to bid. 2) Pursuant to San Francisco Administrative Code ("Administrative Code") Section 6.25 and Chapter 25 of the Environment Code, "Clean Construction" is required for the performance of all work. 3) Bid discounts may be applied as per Administrative Code Chapter 14B. 4) LBE Subcontracting Participation Requirement is 25% LBE. 5) Good Faith Efforts. In accordance with Administrative Code Chapter 14B requirements, all bidders shall submit documented good faith efforts with their bids, except those who exceed the above stated LBE subcontracting participation requirement by 35%. Bidders must achieve 80 out of 100 points to be deemed responsive. Bidders will receive 15 points for attending the pre-bid conference. Refer Form 2B. For details, contact Selormey Dzikunu by phone at (415) 939-9339 or by email at Selormey.Dzikunu@sfdpw.org. 6) For information on the City's Contractor Development Program, call (415) 986-3999 or email cdp@imwis.com. 7) This Project shall incorporate the required partnering elements for Partnering Level 2. Refer to Section 01 31 33 for more details.

Bid Results

Roads / Highways

$9,378,177.00

Public - City

Paving, Site Work

89

18

36

5

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
398
Active Projects
146
Bidding Soon
3,117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2022

April 4, 2022

Project location map

Multiple Locations, San Francisco, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.