Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 13, 2025 at 7:00 PM
Updated February 18, 2025
Site work and paving for a civil project in Centerville, Ohio. Design plans call for site work for a road / highway; and for paving for a road / highway.
As of February 13, 2025, an engineer has been selected and this project is in the design phase. Design firm information has not been determined. Construction is anticipated to start 5 years from now. *The closed solicitation has been included below for reference: Clyo and Bigger Intersection Improvements The services include the preparation of a formal feasibility study and construction contract plans for intersectionimprovements to Clyo and Bigger Roads. The purpose of the intersection improvements is to reduce the crash rate and severity of the accidents. The required feasibility study will need to include roundabout and signalized options for the intersection. Additionally, if the feasibility study indicates the current signal should be replaced with a new one, the traffic signal and pedestrian access shall be designed in accordance with ODOT and City of Centerville Standards. Deadline 05/07/2024 10:00 AM CDT It is anticipated that the selected Consultant will be authorized to proceed by July 2024. Scope Meeting (Scope document completed) 1/17/2024 Feasibility Study (Low-Level or Formal) 1/1/2025 Stage 1 Submitted for Review For Path 2 and higher projects, Stage 1 must include existing ROW line, construction limits, and temporary/permanent Preliminary ROW lines. (Allow ODOT 30 days for review) 8/1/2025 Stage 2 Submitted for Review For Path 2 and higher projects, Stage 2 must include existing ROW line, construction limits, and temporary/permanent Preliminary ROW lines. (Allow ODOT 30 days for review) 2/1/2027 Environmental Document Approved 8/1/2026 Stage 3 Submitted for Review (Includes Bid Document and Estimate) (Allow ODOT 30 days for review) 10/1/2027 Final Compliance R/W Plans Submitted 2/1/2027 PS&E Package to District (Includes Final Plans, Bid Document and Estimate) 3/1/2028 R/W & Utility Clearance by District (District certifies clearance to FHWA. LPA should submit R/W Control Letter to the District one (1) month before this date.) 3/1/2028 Updated Environmental Commitment Checklist (LPA should submit the environmental checklist (D7 format) to the District two (2) weeks prior to the Plan Package date.) 3/1/2028 Plan Package to C. O. (File Date) 5/1/2028 Sale Date (Bid Opening Date) 7/1/2028 Award Date (LPA should submit a summary of bid tabs and the identity of the awarded contractor to the District no later than one (1) week after the award.) 8/1/2028 Estimated Begin Construction 9/1/2028 Estimated End Construction 3/1/2030 The method of Contractor Selection has not been Determined at this time.
Design
Roads / Highways
$1,700,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
