Site work and paving for a civil project in Centerville, Ohio. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Clyo and Bigger Intersection Improvements The services include the preparation of a formal feasibility study and construction contract plans for intersectionimprovements to Clyo and Bigger Roads. The purpose of the intersection improvements is to reduce the crash rate and severity of the accidents. The required feasibility study will need to include roundabout and signalized options for the intersection. Additionally, if the feasibility study indicates the current signal should be replaced with a new one, the traffic signal and pedestrian access shall be designed in accordance with ODOT and City of Centerville Standards. Deadline 05/07/2024 10:00 AM CDT It is anticipated that the selected Consultant will be authorized to proceed by July 2024. Scope Meeting (Scope document completed) 1/17/2024 Feasibility Study (Low-Level or Formal) 1/1/2025 Stage 1 Submitted for Review For Path 2 and higher projects, Stage 1 must include existing ROW line, construction limits, and temporary/permanent Preliminary ROW lines. (Allow ODOT 30 days for review) 8/1/2025 Stage 2 Submitted for Review For Path 2 and higher projects, Stage 2 must include existing ROW line, construction limits, and temporary/permanent Preliminary ROW lines. (Allow ODOT 30 days for review) 2/1/2027 Environmental Document Approved 8/1/2026 Stage 3 Submitted for Review (Includes Bid Document and Estimate) (Allow ODOT 30 days for review) 10/1/2027 Final Compliance R/W Plans Submitted 2/1/2027 PS&E Package to District (Includes Final Plans, Bid Document and Estimate) 3/1/2028 R/W & Utility Clearance by District (District certifies clearance to FHWA. LPA should submit R/W Control Letter to the District one (1) month before this date.) 3/1/2028 Updated Environmental Commitment Checklist (LPA should submit the environmental checklist (D7 format) to the District two (2) weeks prior to the Plan Package date.) 3/1/2028 Plan Package to C. O. (File Date) 5/1/2028 Sale Date (Bid Opening Date) 7/1/2028 Award Date (LPA should submit a summary of bid tabs and the identity of the awarded contractor to the District no later than one (1) week after the award.) 8/1/2028 Estimated Begin Construction 9/1/2028 Estimated End Construction 3/1/2030 The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$2,265,070.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
70
Bidding Soon
1,439
All Active Projects
531
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2024

img_map_placeholder

Bigger Rd & Clyo Rd, Centerville, OH


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.