BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 23, 2021 at 7:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Wilbraham, Massachusetts. Contact the soliciting agency for additional information.

Owners Project Manager (OPM) Services for oversight of architectural work, engineering and construction of a new senior center facility. Time Period for Completed Project: January, 2022-December, 2023 Catlin Architecture of Peterborough, NH, was the firm that worked on the preliminary design, and is the firm that will produce the final design. The Wilbraham Board of Selectmen shall consider the recommendation of the Senior Center Building Committee, and will be the Awarding Authority. The method of Contractor Selection has not been Determined at this time.

Conceptual

Clubhouse / Community Centers

$10,900,000.00

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
798
Active Projects
421
Bidding Soon
5,598
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2022

Project location map

To Be Determined, Wilbraham, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.