BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 26, 2022 at 7:00 PM

Updated November 14, 2023

Site work for a water / sewer project in Wellborn, Florida. Completed plans call for site work for a water / sewer project.

The project will consist of extension of the collection and transmission systems located along CR 137 and CR 136 to the interchange at I-10. The wastewater collection/transmission system will consist of 6" PVC forcemain, one receiving manhole and two lift stations. The wastewater collection/transmission system will connect to the newly constructed gravity main located at 31st Road. The water transmission system will consist of a 12" PVC watermain. The water transmission system will connect to the newly constructed transmission line from the Water Treatment Plant located on CR 137. The construction of both systems will entail horizontal directional drill along with a crossing of I-10 M/WBE's are encouraged to participate in the bid process.

Bid Results

Water / Sewer

$2,617,624.00

Public - County

Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
38
Bidding Soon
892
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2022

March 15, 2022

Project location map

Co Rd 137, Wellborn, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.