Site work and paving for a mixed-use development in Sutton, Nebraska. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.
City of Sutton which are 'generally' identified by the closest street intersection location as: 1. Cedar and Saunders 2. Ash and Main 3. Main and Elm o Each individual location (listed above) will be considered part of the total project. A line item for each project location (using the name and/ or numeral above) cost is required with a TOTAL cost for the entire group street repair project. o Street repair of each project location will need to consider safety and barrier measures, existing concrete removal, any needed base removal, and replacement, concrete replacement for street, curb, and gutter, driveway entry (if needed), any storm drainage inlets (if needed), cutting or widening of seams. City will provide and place crack fill in joints. o Street pavement thickness Street pavement thickness should be bid at 8" depth. o Bid should indicate a line item for the TOTAL cost of removal of concrete. A breakout cost per square yard should be identified on the total Street pBid should indicate a line item for the TOTAL cost of removal of concrete. A breakout cost per square yard should be identified on the total project. It is expected by the city the TOTAL cost of removal of conthat the contractor will deliver refuse concrete and/or asphalt to the city concrete and/or asphalt to the city storage yard; although, if contrac- storage yard; although, if contractor desires to provide an option to tor desires to provide an option to the city for keeping refuse concrete the city for keeping refuse concrete and/or asphalt, such option with its and/or asphalt, such option with its value should be indicated within bid value should be indicated within bid outline as a deduct on project or the estimated tonnage amount of value-added product (crushed concrete material) to be provided back to city after project is completed. Bid needs to include cost for removal and replacement of subgrade. Replacement of 12" of existing subgrade with suitable material needs to be considered into costs. The subgrade breakout cost per square/yard of subgrade should be indicated for the total project. o Bid needs to indicate estimated start date for project and the date for completion of all project locations. Required completion date for all project locations is Aug. 15, 2022. o All aspects of the bid requirements listed above must be indicated in the bid, with a single summary total for the completed project, with alternates outlined. At the above-mentioned deadline, bids will be opened at a meeting within city hall, which is open to the public. The bid need not be awarded at the time of opening, but rather the city reserves the right to hold over bids for further examination and consideration at the next regular city council meeting. Bids received after the submission deadline will be rejected. The City of Sutton reserves the right to reject any or all bids or parts of bids, to waive irregularities and technicalities, and to request re-bid on the project. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.
Award
Roads / Highways
$240,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 6, 2022
February 7, 2022
Multiple Locations, Sutton, NE
Related To This Project
Sutton, NE
Bid Date: Mar 05 2024
Sutton, NE
--
Sutton, NE
--
Sutton, NE
Bid Date: Dec 02 2024
Sutton, NE
Bid Date: Dec 02 2024
Sutton, NE
Bid Date: Sep 07 2023
Sutton, NE
Bid Date: Feb 09 2023
Sutton, NE
Bid Date: Jan 05 2023
Sutton, NE
Bid Date: Feb 04 2021
Sutton, NE
Bid Date: Dec 15 2022
Minden, NE
Bid Date: Jan 18 2022
Omaha, NE
Bid Date: Dec 15 2021
Omaha, NE
Bid Date: Dec 09 2021
Hastings, NE
Bid Date: Jan 18 2022
Chadron, NE
Bid Date: Dec 07 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.