BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and outdoor lighting for a mixed-use development in El Centro, California. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This is the Design-Bid (DB) Team PRE-QUALIFICATION ONLY for the Gomez Park Project. Only DB-Teams that are successfully pre-qualified will be invited to participate in the future Request for Proposal (RFP) process. The future successful RFP responder shall be responsible for designing and constructing the Project conceptualized by the community, as well as identifying any conflicting objects / improvements / vegetation in a demolition plan. Overall, the project features include an all-inclusive playground and fitness areas, pavilion with seating, restroom and concession facility, walking path and sidewalks, parking lot and access road, renovation of existing parking lot, two multi-sport courts, park lighting, a stage, electrical upgrades, soccer field, landscaping and irrigation. Online Q&A Online Q&A Yes Q&A Deadline 09/05/2022 5:00 PM (PDT) The estimated future construction price for the park improvements is $5,200,000 (See Attachment 04). A conceptual plan for the park improvements and project location map are included herein. Background- Gomez Park was originally constructed in the late 1970's. The park is situated adjacent to apartment housing and Imperial Valley Housing Authority properties. The project site has minimal recreational amenities and the amenities in existence are deemed obsolete. The neighborhood in which Gomez Park is located has an older housing stock with deferred maintenance. The park is also a retention basin and will need to continue to function as a joint use retention basin post rehabilitation.

Post-Bid

Playgrounds / Parks / Athletic Fields

$5,200,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
1
Bidding Soon
114
All Active Projects
59
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2022

May 25, 2023

img_map_placeholder

To Be Determined, El Centro, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.