Site work and renovation of a water / sewer project in Fort Myers, Florida. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Lee County Board of County Commissioners seeks to contract with a qualified CONTRACTOR to perform repairs and modifications to the existing RO Permeate (ROP) and RO Supply (ROS) pipes at the LCU Green Meadows Water Treatment Plant (WTP). Work will consist of the following: furnishing all labor, material, superintendence, plant power, light, heat, fuel, water, tools, appliances, equipment, supplies, services and other means of construction and/or demolition necessary or proper for performing and completing the Work. Questions regarding this solicitation are to be directed, in writing, to the individual listed below using the email address listed below or faxed to (239) 485 8383 during normal working hours.Miguel Flores, MFlores@leegov.com A Bid Bond may be submitted on a Lee County paper Bid Bond Form. Must be signed by all required parties, of not less than 5% of proposed dollar amount (including Alternate(s) as applicable) shall accompany each submission.Payment and Performance Bond is to be issued in a sum equal to one-hundred (100%) The County reserves the right before recommending any award to inspect the facilities and organization; or to take any other necessary action, such as background checks, to determine ability to perform is satisfactory, and reserves the right to reject submission packages where evidence submitted or investigation and evaluation indicates an inability for the bidder to perform.The County reserves the right to reject any and all bids or to waive any minor irregularity or technicality in the bids received. Award will be made to the lowest responsible and responsive bidder(s) within the category chosen for basis of award.The County reserves the right to award to one or multiple bidders at the discretion of the requesting authority and approval of the Procurement Management Director. From the Notice to Proceed or the Purchase Order date, whichever applies: 120 calendar days to substantial completion, 30 calendar days from substantial completion to final completion (total day 150) Due to required plant shutdown of a 24-hour period, the awarded CONTRACTOR shall schedule and coordinate with Lee County by the substantial completion date. The County requests from the contractor that the anticipated substantial completion occur as close to July 29, 2022 with final completion for August 29, 2022.

Bid Results

Water / Sewer

$428,100.00

Public - County

Renovation, Site Work

9

14

4

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
79
Bidding Soon
948
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2022

March 3, 2022

Project location map

16001 Airport Haul Rd, Fort Myers, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.